My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
18-20581
Zephyrhills
>
Building Department
>
Permits
>
2018
>
18-20581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 8:23:09 AM
Creation date
1/13/2020 1:52:57 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR II LLC
Building Department - Doc Type
Permit
Permit #
18-20581
Building Department - Name
PIZZA HUT
Address
5897 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HVAC 6.5.2.4.1 Mechanical Humidifiers with airstream mounted preheating ❑ <br /> jackets have preheat auto-shutoff value set to <br /> activate when humidification is not required. <br /> HVAC 6.5.2.4.2 Mechanical Humidification system dispersion tube hot 1:1 El <br /> surfaces in the airstreams of ducts or air-handling <br /> units insulated>=R-0.5. <br /> SYSTEM—SPECIFIC 6.6.3.2.2 Mechanical VAV fans have static pressure sensors positioned <br /> so setpoint<=1.2 in.w.c. design pressure. <br /> SYSTEM—SPECIFIC 6.5.4.5.1 Mechanical Two-position automatic valve interlocked to shut <br /> off water flow when hydronic heat pump with <br /> pumping system>10 hp is off. <br /> SYSTEM—SPECIFIC 6.5.6.2 Mechanical Condenser heat recovery system that can heat <br /> water to 85 A°F or provide 60%of peak heat <br /> rejection is installed for preheating of service hot <br /> water. <br /> HVAC 6.5.7.1.5 Mechanical Approved field test used to evaluate design air <br /> flow rates and demonstrate proper capture and <br /> containment of kitchen exhaust systems. <br /> SYSTEM—SPECIFIC 6.5.9 Mechanical Hot gas bypass limited to: <br /> <=240 kBtu/h W 15% <br /> >240 kBtu/h s€"10% <br /> HVAC 6.4.3.9 Mechanical Heating for vestibules and air curtains include El El El <br /> automatic controls that shut off the heating <br /> system when outdoor air temperatures>45F. <br /> Vestibule heating systems controlled by a <br /> thermostat in the vestibule with setpoint<=60F. <br /> Controls 6.5.10 Mechanical Doors separating conditioned space from the El 1:1 El <br /> outdoors have controls that disable/reset heating <br /> and cooling system when open. <br /> Controls 9.4.1.1 Interior Lighting Automatic control requirements prescribed in <br /> Table 9.6.1,for the appropriate space type,are <br /> installed.Mandatory lighting controls(labeled as <br /> 'REQ')and optional choice controls(labeled as <br /> 'ADD1'and'ADD2')are implemented. <br /> Controls 9.4.1.1 Interior Lighting Independent lighting controls installed per <br /> " approved lighting plans and all manual controls <br /> readily accessible and visible to occupants. <br /> Controls 9.4.1.2 Interior Lighting Parking garage lighting is equipped with required <br /> lighting controls and daylight transition zone <br /> lighting. <br /> Controls 9.4.1.1f Interior Lighting Daylight areas under skylights and roof monitors <br /> that have more than 150 W combined input power <br /> for general lighting are controlled by <br /> photocontrols. <br /> Controls 9.4.1.4 Exterior Lighting Automatic lighting controls for exterior lighting El 1:1 ❑ <br /> installed. <br /> Controls 9.4.1.3 Interior Lighting Separate lighting control devices for specific uses <br /> installed per approved lighting plans. <br /> Wattage 9.6.2 Interior Lighting Additional interior lighting power allowed for <br /> special functions per the approved lighting plans <br /> and is automatically controlled and separated <br /> from general lighting. <br /> Wattage 9.6.4 Interior Lighting Where space LPD requirements are adjusted 0 <br /> based on room cavity ratios,dimensions are <br /> consistent with approved plans. <br /> Insulation 5.5.3.1 Envelope Roof R-value.For some ceiling systems, <br /> verification may need to occur during Framing <br /> Inspection. <br /> Insulation 5.8.1.2,5.8.1.3 Envelope Roof insulation installed per manufacturers€TMs <br /> instructions. Blown or poured loose-fill insulation <br /> is installed only where the roof slope is<=3 in 12. <br /> El El <br /> Insulation 5.8.1.1 Envelope Building envelope insulation is labeled with ❑ <br /> R-value or insulation certificate has been provided <br /> listing R-value and other relevant data. <br /> Insulation 6.8.1.9 Envelope - Building envelope insulation extends over the full <br /> area of the component at the proposed rated R or <br /> U value. <br /> Insulation 5.8.1.4 Envelope Eaves are baffled to deflect air to above the <br /> insulation. <br /> Insulation 5.8.1.5 Envelope Insulation is installed in substantial contact with <br /> the inside surface separating conditioned space <br /> from unconditional space. <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software.Effective Date:Dec 31,2017 <br /> Flodda.Building Code,Sixth Edition(2017)-Energy Conservation ASHRAE 90.1-2013-Prescriptive Compliance Option <br /> 7/6/2018 Page 13 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.