My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20675
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 8:28:06 AM
Creation date
1/14/2020 6:50:07 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-20675
Building Department - Name
GOODELL,RENEE JUDITH
Address
5632 5TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s ® I <br /> Ashton Blvd. <br /> viva '1t. 1800 W hi, UT 84043 <br /> Structural Group <br /> J. Matthew Walsh, SE, PE <br /> Senior Structural Engineering Manager <br /> james.walsh@a vivin tso lar.com <br /> December 07, 2018 <br /> Re: Structural Engineering Services <br /> Goodell Residence <br /> 5632 5th St, Zephyrhills, FL <br /> S-5993120; FL-01 <br /> To Whom It May Concern: <br /> We have reviewed the following information regarding solar panel installation on the roof of the above referenced <br /> home: <br /> 1. Site Visit by a representative from our office under my supervision identifying specific interior and <br /> exterior site information including the condition of the existing roof system and the size, spacing, and <br /> condition of existing structural framing members. Information gathered during the site visit includes <br /> photographs, sketches, and verification forms. <br /> 2. Design drawings of the proposed PV System layout, including details to mount the new solar panels to <br /> the existing roof. <br /> Based on the above information, we have evaluated the structural capacity of the existing roof system to support the <br /> additional loads imposed by the solar panels and have the following comments related to our review and evaluation: <br /> A. Description of Residence: <br /> The existing residence is typical wood framing construction with metal roofing. All wood material utilized for the roof <br /> system is assumed to be Southern Pine#2 or better with standard construction components and consists of the <br /> following: <br /> • Roof Section: Dimensional lumber - 2x6 at 16" on center. Survey photos indicate that there was free <br /> access to verify the framing size and spacing. <br /> B. Loading Criteria <br /> 7.13 PSF= Dead Load (roofing/framing) <br /> 2.59 PSF= Dead Load (solar panels/mounting hardware) <br /> 9.72 PSF=Total Dead Load <br /> 20 PSF= Roof Live Load (based on local requirements) <br /> Wind speed of 145 mph (based on Exposure Category D-the total area subject to wind uplift is calculated for the <br /> Interior, Edge, and Corner Zones of the dwelling.) <br /> C.Solar Panel Anchorage <br /> 1. Installation shall proceed in accordance with the applicable guidelines and recommendations indicated below. <br /> If, during solar!panel installation, the roof framing members appear unstable or deflect non-uniformly, our office <br /> should be notified before proceeding with the installation. <br /> • EcoFasten, Solar Installation Manual, which can be found on the EcoFasten Solar website <br /> (www.ecofastensolar.com). <br /> 2. The solar panels are 11/2" thick and mounted 41/2" off the roof for a total height off the existing roof of 6". At no <br /> time will the panels be mounted higher than 6" above the existing plane of the roof.The maximum allowed <br /> spacing was calculated for the Wind Speed shown in paragraph B above, using the wind load uplift procedures <br /> of ASCE 7-10 and is specified below. These spacing requirements apply to all mount types indicated above. <br /> Page 1 of vivant® <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.