Laserfiche WebLink
� t <br /> ROCK-iT SYSTeM 40 inSTaLL <br /> F <br /> N. <br /> >k <br /> rtI <br /> Fig.A <br /> .Install EcoFasten Solar.Flashing with Rock-it Mounts <br /> .rQeowr'noFastaisalattmtatrbtort�dringandbrad�t(ratali{tu�Fasteosiwvmabove). <br /> .c)ptlu,xm,vertie'�dhtarfcebetvreendigboEtslsl3/B'ptusmoduledirnerwar+. <br /> Setmountsoneavenrost+vx�thatd<eF�-tti'edesTat�mtite5a�ifienriotRadc-ft5tta0a. <br /> '.Set mormtsonail uppermws sothatthello"PadestaltsontheNorthendofllo"Sllde. <br /> 2:Install Rock-It Array Skirt onto Eave Mounts <br /> •Slide Rock-It Anisy skirt Into front channel on Rock It shelf. <br /> •Array Skirt End Caps are"prednstalled on the East end of each skirt section,and are used to couple the skirt sections where needed(see Fig.A) <br /> Tighten Mid-[tamp bolt.damping Rock4t Amy Skirt to mount3mclue to 200 tamft(130►n Itmwhen Installing with 32mmmWides). <br /> 3„A instal)Rock-It Couplings(when Joining 4 panels with a coupling,the use of a load bearing foot is required) <br /> •Prior to mounting an the'roof,snap toad Bearing root two the bottom of Rods-(tCoupting If requited: <br /> (Each Load Bearing Foot is set to same height as the Rock4t Mounts-adjust atxordtngly) <br /> On eavetowonly slide Rock-itArmy-Sidrt onto Rock-1t Coupling Shelf.Torque to specified value <br /> NOTE If a coupling lands on a rafter,the Hybrid Mount*should be used in place of the Rock-It Coupling(refer to image 33). <br /> ;Hybrid Mountcan bemade In thefield by assembling a coupting to a mount pedestal,or by purchasing separately. <br /> 5 Align and Straighten First Row of the Rock-it System with Rock-ICArray Skirt <br /> •Use Nw&SouthadAwjneitof#mRodr4tPedestaitostralghtenRoda4tAMSidrtandatlgnnmdulawfthAmaySktrt <br /> •Torque scruwonsldeofR04**PedE tat to150te4bstosecuteittotheRock4tsikte. <br /> -,Adjust fhngetevelNattoleveithesystrmrtoptionai-canbelevetaidunngorafterInstailation). <br /> instal 1st Row of.PV Modules <br /> 6`9 •SlkieupstopeRddc#Mounbdmntomjagetapoffirstmodule <br /> •.Irutall flock k Caupbgs cn hm upslope sfde of i st mw of pww& <br /> Torque 2nd row ofMkk3mps on RD&4tMoundsandRock4tCouplingstospedficdvalue; <br /> �1 •Ing0babnceofPVmodtde! csawintlu gtttheRo&4tPedestdsamintheappmpdateposttlon thentarqueWd-CWWtoseoaemodutes. <br /> V Level the.Rock-it System <br /> •.whenassem*Iscomptele,Indtheelnthe system by adjusting flange level Nuts Mange Level Nuts havenatorqueva(ue). <br /> •Height <br /> iNS7XIATION NOTE.Modules should be Installed so that the junction box is installed upslope,away from the leading edge of the.array. <br /> www.eccfastensolarcom info@ecofastensclarcom 877-859-3947 5 <br />