Laserfiche WebLink
Snow Load.O 20 psf, <br /> Wind S d- - Exposure. 2:12 c Roo!pitch c 6:12 7:12 c Root Pitch c 17-42 <br /> ASCE 7 O5 ASCE 7.10 Ca o Zone 1 Zone 2. Zone'3 Zone 1 Zone 2 Ions 3 <br /> S 159' 83 69-` <br /> 8s.cnph 110 mph ' C 114 67 .42 86 Be <br /> D . 96 58 35 - 91' 74 . . :. 74 <br /> 8. 146 85 54 <br /> 9D mph 116 mph C 104 61 -38 98 :80 80 <br /> D 88 51 32 83 68 68 <br /> B - 123. 72 46 '96 96 <br /> 100 mph 125 mph • C j 88 '51 32 '83 68 68 <br /> D 74 . ' 43 27._ ,, _ 70 6T 57 . <br /> B 88 57 36 93 76 76 <br /> 110 mph 140 mph C 70. 41 26 65. 54 54 <br /> D 59 34 22 56 .46 46 <br /> B 85 i 50 _31 81' '• 66 Is <br /> 120 mph 160 mph ' C 61 36 22' . 68 47 47 <br /> D 51 .30 _ 19 49 40 40 <br /> Hotel: <br /> Spacing Governed by Snow load <br /> 1.)Values in above table represent the maximum allowable spacing in inches for pullout faces only on EcoFasteri Solar standoff, <br /> however the designer must round down to meat appmpdate miter spacing <br /> 2.)Maximum allowed spacing approved by EcoFastan Solar is 77 <br /> 3.}Maximurrallowed standoff ceporty=647#(per tasting results) <br /> 4.)Includes additional factor of safety of 1.6 for.lag pullout capacky <br /> 5.)Values based on a ma)dmum module width of 4(r <br /> 6,)Based on Risk Category II(ASCE 7:10)structures less than.30 feet In height <br /> 7.)All acUustment factoms are set to 1.No site spebft engineering is Included In"this two <br /> Snow Load 0 20 psf <br /> Wind S ppeed Exposure 2A2<Roof Pitch<-6:12. 7:12<Roof Pitch.<t2:12 <br /> ASCE 7-05 ASCE 7-10 Cate o Zone.1 Zone 2 Zone 3 Zone 1 Zone 2 Zone 3 . <br /> B 83 49 30 <br /> SO Mph 116 mph- C 69 36 22 56 46 46 <br /> D 50 29 18 47 38 38 <br /> B 66 33 20 53 43 43 <br /> 110 mph 140 mph. C 40 23 14 -38 31 31' <br /> D 34 18 12 32 26 Z6 <br /> Notes: <br /> Spacing tiaverned by Snow toad <br /> 1.)Values in above table represent the maximum allowable spacing In Inches for pullout tortes only on Ecol aster Solar stendolf <br /> 2.)Me drum allowed spacing approved I*EcoFeaten Solar is 4W <br /> 1)fibAm an allowed standoff calocity=547#(per testing results) <br /> 4.)Includes additional factor of safety of 1.5 for lag pullout capacity <br /> 6.)Values based on a nuWnwm module length of 7W <br /> &)Based on Risk Category-11,(ASCE-710)structures lass than 30 test in height <br /> 7.)All adnt factors are set to 1.No life specific engineering Is Included In this table <br /> wwwecofastensolarcom info@ecofastensolarcom 877-8S9-3947 8 <br />