My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-20685
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-20685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 6:57:15 AM
Creation date
1/14/2020 6:57:13 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-20685
Building Department - Name
WITTIG,THOMAS P & AMY
Address
5142 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
System Specifications <br /> MECHANICALLY ATTACHED TPO Revised March 2015 <br /> I. Wheh-ca Mule-Hide Premium Warranty is requested,; only Mule-Hide labeled insulation <br /> may be used Unless written approval is obtained,prior to job bid,for an diterhative <br /> J. Insulation other than Mule-Hide labeled insulation must be an FM approved insulation <br /> and acceptable to Mule-Hide for use under the Mule-Hide Mechanically Atta6hej*Roofing <br /> Sys.tem., Refer to the insulation manufacturers guidefine's for the appropriate type;size <br /> and thickness of the insulation needed'for use over the respective-substrate and under <br /> the Mule-Hide Mechanically Attached Roofing System. <br /> K. Muld-Hidels minimum attachment rates shall be as follows' <br /> T by 4'!'boards shall be.2 per board <br /> 4'by..4'boards shall be 4 per board <br /> 4'by 8!boards shallbe 6 per board(for boards up to 2"thick) <br /> 4'by 8'boards shall be 5 Per board(for boards 2"thick or greater) <br /> Contact Mule.-H.We's TOdhnica I.DeP artffient for FM approvals and required attachment <br /> , <br /> rates that are determined by,dock type,insulation'brand,type thickness. When <br /> using <br /> g multipli layers"of"in'sulation or more than one.1 type of,insulation,the number <br /> ber of <br /> ..in multiple <br /> fasteners r6qpired per board is determined by the,top layer of insulation. <br /> L. If.a slipsheet is to be installed,the roof membrane shall be installed immediately after the <br /> slipshedt to prevent any displacement. The slipsheet should be overlapped a.minimurn <br /> of-4 inches on each edge. Plates and fasteners may ben'necessary to anchor the slipsheet <br /> when installing in windy conditions. Sufficient fasteners should be used to ensure the <br /> slipshoets lay flat under the'roof membrane. <br /> 3.07 Membrane Installation <br /> A. General-Unroll the Mule-Hide TPO Membrane and position without stretching. Allow the <br /> membrane to relax at least 15 minutes when the temperature is above 600F,or 30 <br /> minutes when the-temperature is below 666F, prior to installation; Inspect and remove <br /> any damaged membrane: <br /> B. Membrane must run Perpendicular to the direction of steel deck flutes and <br /> orientation of wood de'*c:ks Where possible. <br /> C. All membrane,overlaps shall be installed t-o facilitate the flow of water. Seams shall be <br /> shingled or rub parallel to the-flow. of water. Bacltwafer seams are.not permitted. <br /> D. Lap Sheets a minimum of 5-1/2 inches for-In-Lap Fastening, leaving space for a <br /> continuous, minimum 2'weld beyond the outside edge of the fasteners and ciisics. <br /> Membrane overlaps shall be shingled with the flow of water or parallel to the flow of <br /> water, End laps shall be overlapped a minimum of 3 inches. <br /> E. The roofing contractor shall check all welded seams for continuity and integrity using a <br /> cotter pin puller Qt6thet suitable blunt object. The contractor shall make sample test <br /> searrils each day pr <br /> ior to Welding field seams. The contractor shall, using Scrap material, <br /> run at least two test seams, each a minimum of2'long. Each test team shall be used to <br /> determine adequate seam strength and.to ensure the equipment has warmed.up, <br /> operating properly and proper settings have been determined. This should be done each <br /> time.t,he equipment is iumed'on after a cc-61 down period. <br /> Page 16 05;1111 MULE-HIDE PRODUCTS CO.,INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.