DONNELLY ENGINEERING ELECTRICAL <br /> PART 2-TESTS <br /> 2.1 EQUIPMENT <br /> A. Instruments: Supply all instruments required to read and record data. Calibration date shall be <br /> submitted on test reports. All instruments shall be certified per NETA standards and NFPA <br /> requirements. <br /> B. Adjustments: Adjust system to operate at the required performance levels and within all tolerances as <br /> required by META Standards. <br /> 2.2 APPLICATIONS <br /> A. Panelboard and Equipment Feeders: After feeders are in place, but before being connected to ` <br /> devices and equipment, test for shorts, opens and for intentional/unintentional grounds. <br /> B. Cables 600 Volts or Less: Cables 600 volts or less in size #4 AWG and larger shall be meggered <br /> using an industry approved "megger"with 1000 internal generating voltage. Readings shall be recorded <br /> and submitted to the Engineer. <br /> C. Location and Tabulation: Take readings of voltage and amperage at building main disconnect switch <br /> and at main for each panel, and at the end of the longest branch circuit at each panel. The above <br /> readings shall be taken (1) "no-load" conditions and (2) at"full-load" conditions with all equipment using <br /> electricity. Readings shall be recorded and submitted to the Engineer. <br /> 2.3 GROUNDS <br /> A. Electrode Ground: The resistance of electrodes (main service, generators, transformer, etc.) shall not <br /> exceed 5 ohms and shall be measured by The Contractor before equipment is placed in operation. <br /> Testing shall be performed on all grounding electrode installations. Testing shall be 3 point method in <br /> accordance with IEEE No. 81 Section 9.04 Standard or a clamp-on meter. Submit all ground test <br /> readings to the Engineer in tabulated format prior to energizing electrical equipment. <br /> PART 3 -EXECUTION <br /> 3.1 SUBMITTALS <br /> A. Cable Test Report: Submit Cable Test Report and Ground test to the Engineer upon completion of the <br /> test. <br /> B. Documents: Complete all information on forms at the end of this specification, project information, and <br /> certificate of completed demonstration memo. Submit data for examination and acceptance prior to <br /> final inspection request. <br /> C. Tabulated Data: Submit data on 8-1/2 x 11 inch sheets with names of the personnel who performed <br /> the test. <br /> D. Final: Submit documents before a request for final inspection. <br /> 3.2 QUANTITIES <br /> A. Quantity: Submit 2 copies as part of the record documents. <br /> Heartland Health Care Center of Zephyrhills-3181 16020-2 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />