Laserfiche WebLink
DONNELLY ENGINEERING ELECTRICAL <br /> 3.8 STARTUP <br /> A. Initial: On completion of the installation,the initial startup shall be performed by a factory-trained <br /> service representative of the engine supplier,who shall thoroughly inspect,operate,test and adjust <br /> the equipment. <br /> B. Provisions: The inspection shall include the soundness of all parts, completeness of all details, <br /> proper operation of all components with special emphasis on safety devices, correctness of <br /> settings, proper alignments, and correct phase rotation to match other sources. <br /> C. Field Tests: On site load test specifications shall comply with the load test requirements of article <br /> NFPA 110. <br /> 3.9 SCHEDULED OIL SAMPLING <br /> A. Sampling Analysis: In order to minimize engine failure, the supplier of the equipment shall <br /> provide a quarterly(every three months)oil sampling analysis(for each engine)for a period of two <br /> years from date of acceptance. <br /> B. Method: This scheduled oil sampling shall be of the atomic absorption spectrophotometry method <br /> accurate to within 1 ppm for the following elements: lead, iron,chromium,copper,aluminum,and <br /> silicon. <br /> C. Test Requirements: In addition, test the sample for the presence of water, fuel, dilution, and <br /> antifreeze. <br /> D. Equipment: Provide equipment needed to take oil samples in a kit at the time of acceptance. <br /> Include a sample gun kit, bottles, mailers, and written instructions. <br /> E. Notification: Provide immediate notification (within two hours of analysis) by telephone or fax to <br /> the Owner when analysis results show any critical reading. If readings are normal, provide a report <br /> by mail showing that the equipment is operating within established requirements. <br /> I <br /> F. Owner Availability: This scheduled oil sampling program to be available to the Owner at the <br /> supplier's normal rate, after the mandatory 2 years and shall be continued thereafter at the <br /> Owner's option. <br /> I <br /> j 3.10 HEATER AND ANTIFREEZE <br /> F. General: The engine shall be provided with antifreeze, (a solution of 30 percent ethylene glycol) <br /> and suitable unit mounted thermal circulation type water heaters incorporating a thermostatic <br /> switch to maintain engine jacket water to 90 degrees F in an ambient temperature of 30 degrees F. <br /> The heaters shall be sized as recommended by manufacturer, single phase, 60 Hz 120 volts. <br /> Heaters shall be Kim-Hotstart, Chromalux or accepted substitution. <br /> END OF SECTION <br /> Heartland Health Care Center of Zephyrhills-3181 16650-14 DE No 217032 <br /> 38220 Henry Drive,Zephyrhills, FL 33542 Pending Emergency Rule 59A-4.1265 <br />