Laserfiche WebLink
Please find the attached invoice. <br /> Best regards, <br /> Kevie Defranc <br /> ZEPHYRHILLS-HOMETOWN AMERICA IN THE HEART OF TAMPA BAY <br /> Kevie Defranc <br /> GIS Technician <br /> City of Zephyrhills <br /> City Hall <br /> 5335 Eighth Street <br /> Zephyrhills, FL 33542 <br /> Phone: 813.780.0204 <br /> Fax: 813.780.0005 <br /> Under Florida law,e-mail addresses are public records. If you do not want your e-mail address released in response to a <br /> public records request,do not send electronic mail to this office. <br /> From: Brad Kuhl<BradK@hamiltoneneineering.us> <br /> Sent:Wednesday, December 5, 2018 9:50 AM <br /> To: Kevie DeFranc<KDeFranc@ci.zephvrhills.fl.us> <br /> Cc: Ryan McCaffrey<RvanM@hamiltoneneineering.us>; Mike Lawson<Mike@metrodevelopmentgroup.com>;Sean <br /> Oconnor<Sean@metrodevelopmentgroup.com>;Todd Vandeberg<tvandeberg@ci.zephvrhills.fl.us>; Rodney Corriveau <br /> <RCorriveau@ci.zephvrhills.fl.us> <br /> Subject: RE:ZEPHYR LAKES- HAMILTON ENGINEERING- KOSSIK RD <br /> Hi Kevie, <br /> I have a quick response to your comment number 3 below regarding Wire Road. The attached comments from the <br /> County show that we addressed their concerns on Wire Road. Please note comment 11 has been rectified per Chuck <br /> Wilson's comment in red. We added sections to show the proposed sidewalk and are currently adding detail for the <br /> open cut to extend the storm pipe under Wire. The County has determined that plan and profile is not required for the <br /> entirety of Wire along our project boundary to show the addition of sidewalk and one crossing. <br /> We are addressing the other comments now and I expect to have them back to you by the end of the week. <br /> Thanks, , <br /> ''" ti AMILfTON <br /> ENGINEERING & SURVEYING, INC. <br /> Brad Kuhl,P.E. <br /> Senior Project Manager/Vice President <br /> 3409 W.Lemon Street,Tampa,FL 33609 <br /> c 813.440.7043 1 o 813.250.3535 Ext. 125 <br /> 10 <br />