Laserfiche WebLink
i <br /> 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots,shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. Blower door test shall be provided before C.O. <br /> .26.A cony-of the energy cacls shall be with Permit at all.times <br /> 27 Cony of final.insulation report shall be Provided with Permit before rinaL <br /> 28. No-fence,pool or screen enclosure is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C.- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />