My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21343
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21343
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 1:03:49 PM
Creation date
4/13/2020 1:03:30 PM
Metadata
Fields
Template:
Building Department
Company Name
BAHR'S PROPANE GASE & A/C
Building Department - Doc Type
Permit
Permit #
19-21343
Building Department - Name
BAHR'S PROPANE GAS & A/C
Address
3708 COPELAND DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. To be checked by Inspector <br /> Insulation C303.1 Envelope Roof insulation installed per manufactureraETms ❑ ❑ ❑ <br /> instructions. Blown or poured loose-fill insulation <br /> is installed only where the roof slope is<=3 in 12. <br /> Insulation C303.1 Envelope Building envelope insulation is labeled with ❑ <br /> R-value or insulation certificate providing R-value <br /> and other relevant data. <br /> Fenestration C303.1.3 Envelope Fenestration products rated in accordance with 0 ❑ <br /> NFRC. <br /> Fenestration C303.1.3 Envelope Fenestration products are certified as to ❑ <br /> performance labels or certificates provided. <br /> Insulation C303.2,C402.2.4 Envelope Floor insulation installed per manufacturer's ❑ ❑ ❑ <br /> instructions.Cavity or structural slab insulation <br /> installed in permanent contact with underside of <br /> decking or structural slabs. <br /> Insulation C303.2.1 Envelope Exterior insulation protected against damage, ❑ <br /> sunlight,moisture,wind,landscaping and <br /> equipment maintenance activities. <br /> Insulation C303.2.1 Envelope Exterior insulation is protected from damage with ❑ ❑ <br /> a protective material.Verification for exposed <br /> foundation insulation may need to occur during <br /> Foundation Inspection. <br /> Insulation C402.1.3 Envelope Non-swinging opaque doors have R-4.75 0 ❑ ❑ <br /> insulation. <br /> Insulation C402.2.2 Envelope Skylight curbs are insulated to the level of roofs <br /> with insulation above deck or R-5. <br /> Insulation C402.2.2 Envelope Insulation intended to meet the roof insulation <br /> requirements cannot be installed on top of a <br /> suspended ceiling.Mark this requirement <br /> compliant if insulation is installed accordingly. <br /> Air Leakage C402.5 Envelope Building envelope contains a continuous air ❑ ❑ ❑ <br /> barrier that has been tested and deemed to limit <br /> air leakage<=0.40 cfm/ft2. <br /> Air Leakage C402.5.1 Envelope The building envelope contains a continuous air ❑ <br /> barrier that is sealed in an approved manner and <br /> either constructed or tested in an approved <br /> manner. Air barrier penetrations are sealed in an <br /> approved manner. <br /> Air Leakage C402.5.1.1 Envelope All sources of air leakage in the building thermal <br /> envelope are sealed,caulked,gasketed,weather <br /> stripped or wrapped with moisture <br /> vapor-permeable wrapping material to minimize <br /> air leakage. <br /> Air Leakage C402.5.1.2.1 Envelope The building envelope contains a continuous air <br /> barrier that is sealed in an approved manner and <br /> material permeability<=0.004 cfm/ft2. Air barrier <br /> penetrations are sealed in an approved manner. <br /> Air Leakage C402.5.1.2.2 Envelope The building envelope contains a continuous air ❑ <br /> barrier that is sealed in an approved manner and <br /> average assembly air leakage—0.04 cfm/ft2. <br /> Air barrier penetrations are sealed in an approved <br /> manner. <br /> Air Leakage C402.5.2,C402.5.4 Envelope Factory-built fenestration and doors are labeled ❑ ❑ <br /> as meeting air leakage requirements. <br /> Air Leakage C402.5.3 Envelope Where open combustion air ducts provide <br /> combustion air to open combustion fuel burning <br /> appliances,the appliances and combustion air <br /> opening are located outside the building thermal <br /> envelope or enclosed in a room,isolated from <br /> inside the thermal envelope <br /> Air Leakage C402.5.5, Envelope Stair and elevator shaft vents have motorized ❑ <br /> C403.2.4.3 dampers that automatically close. <br /> Air Leakage C402.5.5, Envelope Outdoor air and exhaust systems have motorized ❑ ❑ <br /> C403.2.4.3 dampers that automatically shut when not in use <br /> and meet maximum leakage rates.Check gravity <br /> dampers where allowed. <br /> Air Leakage C402.5.6 Envelope Weatherseals installed on all loading dock cargo ❑ <br /> doors. <br /> EnergyGauge Summit®Fla/Com-2017.TAM 2017-1.0 Compliant Software.Effective Date:Dec 31,2017 <br /> Florida Building Code,Sixth Edition(2017)-Energy Conservation IECC 2015-Total Building Performance Compliance Option <br /> 10/5/2018 Page 12 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.