Laserfiche WebLink
}} i <br /> 23. Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final_at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3.shall be applied to the <br /> following: <br /> Piping 314 inch (19.1 mm)and larger in nominal diameter. <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside'the conditioned space.. <br /> Piping-from the water heaterto.a distribution manifold., <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25: Blower door test shall be provided before C.O. <br /> 26. A copy ofthe enerQy cacls shall be with permit at all times. <br /> 27 Copy of final.insulation report shall be provided with permit before final <br /> 28. No fence,pool or screen enclosure Is issued with.this vermin <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition' <br /> R.O.W.-Right of Way. <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />