Laserfiche WebLink
F. Where Contract Documents conflict, such conflict shall be brought to the attention of the Architect <br /> for clarification. In general, the Architectural Drawings shall take precedence over the HVAC <br /> Drawings with regard to building construction. Any change from the Drawings necessary to make <br /> the work conform to the building as it is constructed, to fit the work of other trades, or to the rules <br /> of authorities having jurisdiction, shall be made at no expense to the Owner. <br /> G. No interpretation shall be made from the limitations of symbols and diagrams that any elements <br /> necessary for complete Work are excluded. <br /> H. Certain details appear on the Drawings, which are specific with regard to the dimensioning and <br /> positioning of the Work. These details are intended only for the purpose of establishing general <br /> feasibility. They do not obviate responsibility for field coordination for the indicated Work. <br /> I. Capacities, sizes and conditions specified or shown are allowable minimums. Based on design <br /> and rated operating conditions of systems, motors shall not be overloaded. Equipment shall not <br /> operate at speeds or temperatures greater than manufacturer's published recommendations, and <br /> no strain or demand shall be imposed upon any component to any system, structure or building. <br /> J. The Engineer reserves the right to make minor changes in the location of HVAC work or <br /> equipment prior to "roughing-in" without additional cost to the contract. Engineer approval for <br /> deviations from drawing locations and layout shall be obtained prior to installation. <br /> K. The use of a word in the singular shall not be considered as limiting where other indications <br /> denote that more than one item is required. <br /> L. In the event that extra work is authorized, work shown on Drawings depicting such work, and/or <br /> described by Addendum, Architectural Supplemental Instruction, or by Change Order, shall be <br /> subject to the basic requirements set forth in Division One and Contract Documents in all <br /> respects. <br /> 1.6 QUALIFICATIONS <br /> A. All entities and personnel performing work for this project shall be regularly engaged and <br /> experienced in the type of work to be furnished and shall be licensed for such specialty trades, <br /> employ only properly qualified foremen, journeymen and apprentices as appropriate and in <br /> keeping with best trade practices. <br /> B. Each firm shall provide, upon request, a list of similar jobs it has completed. <br /> 1.7 CONSTRUCTION REQUIREMENTS <br /> A. Locations of all pipes, ducts, panels, appliances, etc., as shown on the Drawings are approximate <br /> only and are understood to be subject to such revisions as may prove necessary or desirable at <br /> the time the work is installed. All work shall be installed with relation to building conditions and <br /> shall be installed correct with reference to finished elevations, etc. Exterior utilities shown on the <br /> drawings are diagrammatic only. Their exact locations, depths and invert elevations shall be as <br /> required for proper flow and coordination with other trades. <br /> B. The Drawings show the general arrangement of piping and ductwork. Should local conditions <br /> necessitate any rearrangement, and before proceeding with the work, prepare and submit five (5) <br /> copies of Drawings of the proposed arrangement for the Architect's review. <br /> C. If equipment, piping, and ductwork, are installed requiring space conditions other than those <br /> shown, or arranged, and rearrangement of the space is necessitated, the Engineer shall review <br /> CEA#18010 HEATING,VENTILATING AND AIR CONDITIONING (HVAC) 23 00 00-3 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />