My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21503
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:53:03 AM
Creation date
4/15/2020 6:52:36 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
19-21503
Building Department - Name
CITY OF ZEPHYRHILLS (POLICE DEPT)
Address
6118 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. All products with compressor sections shall be started by a factory trained service technician. <br /> Provide written report indicating start-up results. Provide extended compressor parts warranty for <br /> all compressors for a total five year warranty on all compressors. Provide manufacturer's phase <br /> loss protection. <br /> 3.2 SHOP DRAWINGS AND SUBMITTALS <br /> A. The Engineer shall have the authority to determine the method of submitting shop drawings <br /> whether in multiple sets or by the reproducible transparency technique. <br /> B. Submittals are required for all items of mechanical equipment and products. <br /> C. For items reviewed and marked "Rejected" or "Revise and Resubmit", only one additional <br /> submittal will be reviewed to verify product compliance with the Contract Documents. Should <br /> further submittals be required for the Design Professional to verify the submittal with the <br /> requirements of the Contract Documents, the hourly rate of $ 150.00 will be billed to the <br /> Contractor for the Professional(s)time spent on the review. <br /> D. Submittals shall be referenced to the Contract Documents. For all equipment, which has been <br /> scheduled directly on the Drawings, provide within the submittal, a performance schedule for the <br /> proposed equipment in the same format as included on the Contract Documents. <br /> E. Manufacturer's catalog cuts may be submitted for all standard cataloged equipment, provided that <br /> the item required to meet the project specification is not modified in any way from the standard <br /> catalog version. Where multiple products are included on the same cut sheet, clearly identify the <br /> product proposed for installation by striking through all sections not applicable to the proposed <br /> product. Do not provide useless or unnecessary pages in the submittal package. <br /> F. Cut sheets shall be clearly marked to indicate the exact size, type, rating, capacity, etc., of the <br /> item to be provided. <br /> G. Bind shop drawings/catalog-cuts in three ring binders with a title sheet and identification on front <br /> and side of the binder. Allow space for Contractor, Project Architect and Engineer review stamps. <br /> Index all items to the Project Manual or Drawings as applicable. <br /> H. All submittals must bear the handwritten signature of the Contractor and his stamp of approval <br /> before being considered for review by the Engineer. <br /> I. Full electrical characteristics for each device requiring power shall be prominently displayed on <br /> the shop drawings or submittal. Additionally, a statement signed by maker of the submittal shall <br /> be included indicating that he or she has carefully examined the electrical characteristics <br /> specified in the Contract Documents (and if remodeling or an addition, as to existing electrical <br /> characteristics), and that the motors, equipment or devices proposed to be furnished are fully <br /> compatible. <br /> A similar statement shall be included stating the supplier has reviewed the space requirements of <br /> the project and that the submitted equipment will fit in the space provided and the manufacturer's <br /> required service requirements have been met. <br /> J. Shop drawings that deviate from the requirements of the contract documents shall list all <br /> differences in a cover letter attached to top of the submittal. <br /> 3.3 EXAMINATION OF EXISTING CONDITIONS <br /> CEA#18010 HEATING,VENTILATING AND AIR CONDITIONING (HVAC) 23 00 00-6 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.