My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21503
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 6:53:03 AM
Creation date
4/15/2020 6:52:36 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
19-21503
Building Department - Name
CITY OF ZEPHYRHILLS (POLICE DEPT)
Address
6118 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elements, chases and openings in floors and walls, and to provide clearances which may be <br /> required to accommodate the work. Set all sleeves, anchor bolts and inserts required to <br /> accommodate equipment before concrete is poured or masonry work is started. <br /> C. Should uncharted or incorrectly charted piping, ductwork, or other utilities be encountered during <br /> work operations, notify the Engineer immediately for clarification. <br /> D. Immediately act to put any damaged utilities back in functioning conditions. <br /> E. Installation and equipment shop drawings shall be initialed and dated upon installation. This <br /> procedure will enable the Engineer to verify the work in progress. <br /> F. The Contractor shall be responsible for the work until its completion and formal final Substantial <br /> Completion. Replace any work which may be damaged, lost or stolen without additional cost to <br /> the Owner. <br /> G. Provide all scaffolding, rigging, hoisting, and services necessary for erection of the work and for <br /> delivery to and removal from the premises of any equipment and apparatus furnished. Remove <br /> same from premises when no longer required. <br /> H. Minimize construction noise levels in all locations adjacent to or in occupied areas. The Owner <br /> reserves that right to prevent use of any tools which cause detrimental vibration or noise when <br /> the facility is occupied. <br /> I. Protect equipment and materials during construction from damage from water, dirt, welding and <br /> cutting splatter, paint drippings, etc., by use of shields and drop cloths. Damaged equipment or <br /> materials shall be repaired (or replaced)to the Architect's satisfaction. <br /> J. Provide the following accessory materials for mechanical systems. <br /> 1. Anchor bolts or other anchoring devices shall be of the size and type recommended by <br /> equipment manufacturer for specific application. <br /> 2. Structural support (steel) for elevated or suspended mechanical items shall be made with <br /> connections using "simple"framing. <br /> 3. Resilient isolation pads for motors and equipment shall be rubber-in-shear pads and of <br /> type recommended by manufacturers of the motor and equipment. All air handlers and <br /> cooling equipment shall be provided with isolation pads between the equipment and the <br /> concrete housekeeping pad. <br /> 4. Dielectric fittings shall be provided between dissimilar metals such as copper piping joins <br /> steel or iron piping, insulating bushings or unions. <br /> 5. Escutcheons shall be provided where pipes pierce partitions, floors, walls or ceilings. <br /> Escutcheons shall be chrome plated. <br /> 6. All pipe and duct penetrations of rated floors and walls shall be properly sealed in <br /> accordance with UL approved details. Coordinate penetrations with the appropriate <br /> detail or reference on the Contract Drawings. <br /> 7. Provide a secondary drain pan under all condensate producing equipment. Drain pan <br /> shall include a float switch wired to shut down the air handler and cooling system once <br /> tripped. <br /> K. Delay caused by equipment not being on the job site when required shall be avoided in the <br /> following manner: <br /> Provide temporary substitute equipment(subject to approval of the project Engineer), allowing the <br /> building to become operative. The temporary substitute equipment shall later be removed and <br /> replaced with that originally specified or approved when it arrives, all at the convenience of and at <br /> no additional cost to the Owner. <br /> CEA#18010 HEATING,VENTILATING AND AIR CONDITIONING (HVAC) 23 00 00-5 <br /> COPYRIGHT©2018 CONSULTING ENGINEERING ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.