Electrical Scope of Work <br /> General Scope of Work(SOW)=Day 1 <br /> 1). Provide labor,supervision,consultation,and/or materials to perform the services and provide the <br /> deliverables described:in this SOW. <br /> 2) Complete trenching and/or directional boring for electrical and low voltage conduit pathway. <br /> 3) Saw cut primary drive:thru or concrete divider as required based on the specific location:. Up to 15'. <br /> of saw cutting,for drive lane. <br /> 4) Installation of low voltage pathway.(see Conduit Pathway Drawing below).The pathway is to include <br /> the required pull string for"LVC" Low Voltage Conduitwork and should be at-a minimum depth as <br /> required by code or same depth as electrical pathway and 6"-away from the electrical conduit.The <br /> conduit shall extend a minimum of 5"above the top of the concrete foundation. It shall include the <br /> following materials: <br /> a:One 2" PVC Conduit from building to Lane 1 Outdoor Menu Board (ODMB). <br /> b.One 1" PVC Conduit from Lane 1 ODMB to Lane 1 Pre-Browse board. <br /> c.One 1%"(1.25") PVC Conduit from Lane 1 ODMB to Lane 2 ODBM. <br /> d.One 1" PVC Conduit from Lane 2 ODMB to Lane 2 Pre-Browse board. <br /> 5) Installation of electrical pathway(see Conduit Pathway Drawing.below),The pathway is to include <br /> the required pull-string for electrical work and should:be at a. minimum depth required by code and a <br /> minimum depth of 18"and 6 away from the low voltage conduit.The.conduit shall.extend'a minimum <br /> of 5"above the top of the concrete foundation.it shall include the following materials: <br /> a.One 3/4" PVC Conduit from Electrical Circuit Panel to J-Box. <br /> b.One 8/4" PVC Conduit from J=Box/pull box to Lane 1 ODMB. <br /> c:One 3/4"PVC Conduit from Lane 1 ODMB to Lane 1 Pre-Browse board. <br /> d..One 3W. PVC Conduit from Lane 1 ODMB to Lane 2 ODMB. <br /> e:One 3/4" PVC Conduit from Lane 2 ODMB to Lane 2 Pre-Browse board. <br /> 6) Running.electrieal wire from the new ODMB foundations to the Electrical CP Panel. <br /> a. 1-20 AMP isolated circuit per drive thru lane. <br /> b.6'feet left on each end to terminate and allow for service loop. <br /> c..The typical site will be<150'from circuit panel to end-point. <br /> i. 50'from panel to.pull box. <br /> ii. 20,to ODMB#1 from pull box. <br />