My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21520
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21520
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2020 9:17:12 AM
Creation date
4/15/2020 7:13:48 AM
Metadata
Fields
Template:
Building Department
Company Name
MCDONALDS
Building Department - Doc Type
Permit
Permit #
19-21520
Building Department - Name
FRANCHISE REALTY MCDONALDS
Address
6042 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S P E N C E R <br /> T E C H N O L O G I E S <br /> iii.20'from ODMB#1 to presale board. <br /> iv. 20'from ODMB#1 to ODMB#2 including 12'of saw cutting. <br /> v. 20'from ODIVIB#2 to presale board#2. <br /> 7) Clean up from installation and remove waste from the site including; but not limited to,.car_dboard,, <br /> rocks,grass,shrubs,construction debris,etc. <br /> 8) Level ground and return site to previous condition. <br /> General-Scope of Work(SOW)—Day 2 <br /> 1) Complete.electrical wiring terminations at the Pre-Browse,ODMB's and at the electrical panel. <br /> 2) Disconnect old ODMB power defined below: <br /> a: Locate power disconnect switchbox for ODMB with integrated orange rocker switch. <br /> b. Remove the plate with integrated switch from electrical box. <br /> C. Remove the black(hot)wire coming from the conduit to the back of the orange power switch, <br /> cut the terminal off and cap with appropriate-sized wire nut. <br /> d. Remove the white(neutral)wire coming from the conduit to the back of the orange power <br /> switch,cut the terminal off and cap with appropriate-sized wire nut. <br /> e.Secure the wire nuts with electrical tape(if required). <br /> f. Replace the plate with integrated switch over the electrical box or cover with a blank outdoor <br /> outlet plate(not included). <br /> g.:Reinstall access panels of signage as required. <br /> 3) Disconnect,cut and cap electrical wires on old foundations. Install customer provided foundation <br /> covers over existing menu board foundations. <br /> a. If required remove signage bolts and cut conduit stubs to make them fit within/under the <br /> foundation covers. <br /> b.Complete site safety check. <br /> 4) Paint the newly installed conduits that runup the building and penetrates the building to match the <br /> existing,color of the building. <br /> Notes: <br /> 1.)All local electrical codes take precedence over this document. <br /> Page 1 of 8 Spencer-Project Electrical_and Sign SOW_06202018 <br /> Template ID:SOW20161024 January 31,2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.