Laserfiche WebLink
{ <br /> ONEMOletc. <br /> 6.1 Soprema Roof Underlayments shall be installed in accordance with Soprema published installation requirements <br /> subject to the Limitations set forth in Section 5 herein and the specifics noted below. <br /> 6.2 Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to <br /> remove any dust and debris prior to application, and prime the substrate with Elastocol Stick, Elastocol 600c or <br /> RESISTO EXTERIOR PRIMER(if applicable). <br /> 6.3 Lastobond TU HT, Lastobond Shield, Lastobond Pro HT-N, RESISTO SA SMOOTH PLY 40, Lastobond Shield HT, <br /> Lastobond Pro HT-S,EnviroShield,Lastobond Eaves Protection Sheet,Lastobond 195,Lastobond Eco,Lastobond <br /> Smooth Seal HT,RESISTO L81236,Grip-Rite Eave&Valley Protector,RESISTO LB1244 or Colphene FIR GR: <br /> 6.3.1 Shall be installed in compliance with the requirements for ASTM D1970 underlayment in FBC Table 1507.1.1 for <br /> the type of prepared roof covering to be installed. <br /> 6.3.2 Non-Tile Applications: <br /> While priming is optional,Soprema recommends priming with Elastocol Stick,Elastocol 600c or RESISTO EXTERIOR <br /> PRIMER if the final roof cover is not slated for installation within 24 hours. <br /> Apply sheet parallel to the roof edge. Roll out approximately 10 ft of membrane and peel back the first 3 ft of <br /> release film. <br /> Adhere the exposed part to the substrate and unroll the remaining membrane as far as possible. <br /> Once the entire length of membrane is in place, peel-off the release film diagonally while holding the membrane <br /> tight. Firmly roll the membrane into place to achieve a bond. <br /> Horizontal seams should be minimum 3-inches,configured to shed water. Vertical seams should be 6-inches and <br /> staggered not less than 2-ft from vertical seams in the course below. All over-granule end-laps shall be sealed <br /> using either heat-welding or hot air welding techniques. <br /> When installing at slopes above 8:12, Soprema recommends back-nailing in the overlap area at the top of the <br /> sheet at 12-inch o.c. <br /> For Valleys and Ridges: Cut underlayment into 4 to 6 foot lengths. Peel the release paper and center sheet over <br /> valley or ridge. Drape and press sheet into place,working from the center of the valley or ridge in each direction. <br /> For valleys,apply the sheet starting at the lowest point and work upward. <br /> 6.3.3 Tile Applications(Lastobond TLI HT or Colphene FR GR only): <br /> Reference is made to FRSA/TRI April 2012 (04-12) Installation Manual and Table 1 herein, using the instructions <br /> noted above as a guideline. <br /> For foam-on the applications, reference is made to Section 5.6.4 herein for wind resistance limitations that fall <br /> outside the scope of FRSA/TRI April 2012(04-12). <br /> Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the underlayment. See <br /> Table 2 herein,and Soprema published requirements for tile staging. <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of <br /> this product. <br /> NEMO ETC,LLC Evaluation Report S18010.06.09-R12 <br /> certificate ofAuthorizatioa#3245S 6'"EDITION(2017)FBC NON-HVH2 EVALUATION FL2569-R14 <br /> Soprema Roof Underlayments Revision 12:02/12/2018 <br /> Page 7 of 8 <br />