My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21558
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 9:00:57 AM
Creation date
4/15/2020 9:00:42 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-21558
Building Department - Name
KING,GARRY
Address
38840 3RD AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11<0 <br /> Installation Instructions for <br /> Asphaft Shingles <br /> Page 3 of 6 <br /> IKO Laminated Shingles Application Instructions <br /> (ASTM D3161,Class F—Cambridge,Cambridge HD,and CRC BlItmore AR) <br /> NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKOIS PUBLISHED <br /> APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION <br /> CONFLICT,THESE INSTRUCTIONS WILL GOVERN. <br /> ROOF DECK: Solidly sheathed and fastened deck conforming to 2017 FBC. <br /> UNDERLAYMENT:Applied In accordance with building code requirements.Forareaswhere the roof slope Is <br /> less than 4" per foot down to 2" per foot, use 2 layers of underlayment conforming to building code <br /> requirements,the first sheet overlapping the eave protection by 19",followed by full 36"widths overlapping <br /> each preceding course by 19"or other Approved underlayments in accordance with the qualified application <br /> instructions. For areas where the roof slope is 4" per foot or greater, cover the deck with one ply of <br /> underlayment laid parallel to the eaves,With 2"horizontal laps and 4"end laps. Apply metal drip edges on top <br /> of any underlay along rake edges and directly to the deck along eaves in accordance with building code <br /> requirements. <br /> NAILING:Use galvanized(zinc coated)roofing nails,11 or 12 gauge,with at least 3/8"diameter heads,long <br /> enough to penetrate through plywood or 3/4"into boards. Use 4 nails per shingle placed in the nail line 7-3/8" <br /> below the top edge,approx.I"and 13"in from each end. Drive nails straight so that nail head is flush with, <br /> but not cutting into shingle surface. <br /> NAILING ON STEEP SLOPES:For steep slopes of 21"per foot(600)or more,use 6 nails per shingle placed <br /> as shown below. Ensure that no nail is within 2"of a joint/cutout of the underlying shingle. Seal down each <br /> shingle at time of application with three I"diameter(approx.size and thickness of a quarter)spots of asphalt <br /> plastic cement placed under the shingle 2" above the bottom edge and equally spaced along the shingle. <br /> Apply plastic cement In moderation since excessive amounts may cause blistering. CAUTION: Shingles <br /> should seal to the underlying course when the factory applied asphalt sealant is sufficiently warmed by the <br /> heat of direct sunlight. <br /> EXPOSURE: Installed shingles shall have a maximum average exposure of 5-7/8". <br /> NAILING-STEEP SLOPES APPLICATION <br /> Use six nails as shown. <br /> + <br /> MAIL LINE <br /> ------------ <br /> 14AILS CE-AE—W-7 � <br /> PROPER APPLICATION REQUIRES THAT THE NAILS PENETRATE BOTH THE OVERLAY AND UNDERLAY PORTIONS OFTHE SHINGLE <br /> PRIConstrucUon Materials Tedmologies,LLC.6412 Badger Ddve Tampa FL33610 Tel:813-621-5777 Fax:813-621-5840 e-mail: aledafstednq@pdwntcom WebS!te:hiipjA%W.pAunLcom <br />
The URL can be used to link to this page
Your browser does not support the video tag.