My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21558
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 9:00:57 AM
Creation date
4/15/2020 9:00:42 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-21558
Building Department - Name
KING,GARRY
Address
38840 3RD AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> tK0 <br /> Installation Instructions for <br /> Asphalt Shingles <br /> Page 5 of 5 <br /> IKO Leading Edge Plus Application Instructions <br /> (ASTM D3161,,Class F—IKO Leading Edge Plus) <br /> NOTE: THESE INSTRUCTIONS SHALL BE USED IN CONJUCTION WITH IKO'S PUBLISHED <br /> APPLICATION INSTRUCTIONS AND THE APPLICABLE CODE. IN THE EVENT THE INSTRUCTION <br /> CONFLICT,THESE INSTRUCTIONS WILL GOVERN. <br /> 1. Apply any underlayment,eave protection,valley flashings,or drip edges to roof deck as required. <br /> 2. Each 39 3/8"x 131/4"(1000 mm x 336 mm)IKO Leading Edge Plus strip is perforated lengthwise for <br /> separation into two(2)shingles.Take one IKO Leading Edge Plus strip and fold flat at perforation to <br /> separate. <br /> 3. Take one of the separated shingles 39 3/8"x 6 5/8"(1000 mm x 168 mm)and remove approximately <br /> 20"(500 mm). Install this shingle on the lower left comer of the roof deck,granule side up,with the <br /> factory installed sealant adjacent to the eaves.The shingle should overhang the rake edge and eaves <br /> by a nominal 1/4"(6 mm)minimum.Fasten the shingle to the roof deck with nails located 3"to 4"(75 <br /> mm to 100 mm)from the eave edge and 1"(25 mm)in from each end. <br /> 4. Take the leftover 20"(500 mm)piece shingle.Rotate the piece and align it vertically up the rake edge <br /> with the factory installed sealant adjacent to the outer edge of the roof.The shingle should overhang <br /> the rake edge by a nominal 1/4"(6 mm)minimum.Fasten the shingle to the roof deck with fasteners <br /> located 3"to 4"(75 mm to 100 mm)from the rake edge and 1"(25 mm) in from each end. <br /> 5. Repeat Steps 3—4 for the right lower corner of the roof deck. <br /> NAILING: Use galvanized(zinc coated)roofing nails, 11 or 12 gauge,with at least <br /> 3/8"(9 mm)diameter heads,long enough to penetrate through plywood or 3/4"(20 <br /> mm)into boards. Use 4 nails per shingle placed 3"to 4"(75 mm to 100 mm)from <br /> the eave edge and approximately 1"and 13"(25 mm and 330 mm)in from each end. <br /> 6. Apply full-length IKO Leading Edge Plus shingles to the remaining eave edges of the roof deck.Install <br /> the shingles granule side up with the factory applied sealant adjacent to the eaves. The shingles <br /> should overhang the rake edge and eaves by a nominal 1/4"(6 mm)minimum.Fasten the shingles to <br /> the roof deck with nails located 3"to 4"(75 mm to 100 mm)from the eave edge,4 nails per shingle. <br /> 7. Apply roof shingles as per the instructions printed on each product's package.Make certain the first <br /> course of field shingle lies flush with the edges of the fastened IKO Leading Edge Plus.In this way, <br /> the sealant on the IKO Leading Edge Plus shingles will adhere to the first-course field shingles and <br /> help keep them from lifting in high winds. <br /> i <br /> i <br /> i <br /> I <br /> . I <br /> i <br /> i <br /> 1 <br /> f <br /> r <br /> i <br /> 1 <br /> 1 <br /> i <br /> i <br /> t <br /> PRI Construction Materials Technologies,I.I.C.6412 Badger Drive Tampa,Fl.33610 Tel:813-621-5777 Fax:813-621.5840 e-mail:materialslesting@pricmt,com WebSite:http-lhvww.prlcmt.com <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.