My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21754
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 8:31:12 AM
Creation date
5/11/2020 8:22:16 AM
Metadata
Fields
Template:
Building Department
Company Name
PARK PLACE CENTER
Building Department - Doc Type
Permit
Permit #
19-21754
Building Department - Name
MARGOLIN,HOWARD REV TRST
Address
3795 CRREIA DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Data <br /> Discharge <br /> Sprinkler Coefficient Max.Workingg7psiO.48 <br /> Temperature Fusible <br /> Identification Thread <br /> K factor Response Pressure Rating Element Finish Approvals <br /> Number(SIN) size <br /> English Metric English Metric English Metric Color <br /> RA4454 5.6 Sp Quick 1/z NPT 175psi 12bar 212°F 100°C Green Bronze cULus <br /> Res onseListed* <br /> 'cULus Listing applies only for the installations and conditions indicated in the"Design Specifications"Section of this bulletin. <br /> Material Data (Refer to Fig. 1): <br /> Frame Deflector Load Screw us e F <br /> Screw Cup Sealing Washer Strut Lever Ejection Spring <br /> Nickel Alloy coated Element <br /> Brass Brass Brass Bronze with PTFE Adhesive Stainless Steel Stainless Steel Nickel Alloy Stainless <br /> Tape Steel <br /> When using 1 in. (DN25)or larger pipe, a hanger must be <br /> Sprinkler Components located at the truss nearest a sprig for purposes of restraint. <br /> If using 3/4 in.(DN19)piping,all sprigs over 12 in.(305 mm) <br /> 1. must be laterally braced using methods described in the <br /> es ro,s� DEFLECTOR NFPA standards. Where the CPVC must be offset up and <br /> over an obstruction and the pipe exceeds the allowed hori- <br /> zontal positioning requirements specified above as well as <br /> LEVER shown in Figs. 2 and 3, additional Model KFR-CCS Sprin- <br /> rCA <br /> klers are to be installed to protect the CPVC products.A min- <br /> LINK imum lateral distance of 18 in.(457 mm)must be maintained <br /> between the CPVC pipe and heat pumps, fan motors, and <br /> SEALING heat lamps. <br /> WASHER <br /> ING Concealed Space Area: <br /> 2�i5''" The area of the concealed space is not limited; however, <br /> for both Figs.2 and Fig.3 where CPVC pipe is being utilized, <br /> draft-curtains or full height walls must be provided at 1,000 <br /> ft2 (93 m2) areas.This draft curtain shall be at least 1/3 the <br /> depth of the concealed space or 8 in.(203 mm),whichever <br /> is greater, and be constructed using a material that will not <br /> allow heat to escape through or above the draft curtain. <br /> Concealed Space Size: <br /> Fig. 1 The Model KFR-CCS sprinkler is specifically listed for use <br /> 'Note: In order to be considered "noncombustible insu- in horizontal combustible concealed spaces with aslope not <br /> lation-filled, solidwood or composite wood joists" exceeding 2 in 12 with combustible wood truss, wood joist <br /> construction, the insulation (including insulation construction, or bar joist construction having a combustible <br /> provided with a combustible vapor barrier), must upper surface and where the depth of the space is less than <br /> completely fill the pockets between the joists to 36 in (914 mm)from deck to deck,from deck to ceiling, or <br /> the bottom of the joists. Insulation installed above with double wood joist construction with a maximum of 36 in. <br /> the elevation of Model KFR-CCS sprinklers in (914mm)between the top of the bottom joist and the bottom <br /> wood truss, solid wood joist or composite wood of the upper joist. NFPA 13 permits the use of the Model <br /> joist must be secured into place with metal wire KFR-CCS sprinkler (a) where the space is less than 12 in <br /> netting.The metal wire netting is intended to hold (305 mm) from deck to deck or deck to ceiling, and/or(b) <br /> the insulation in place should the insulation be- where a portion of the protected space exceeds 36 in.(900 <br /> come wet by the operation of Model KFR-CCS mm). <br /> Sprinklers in the event of a fire. System Type: <br /> In order to use the CPVC pipe and fittings, the horizontal Light hazard,wet pipe system. <br /> runs of pipe must be a maximum of 6 in.(152 mm)above the <br /> ceiling or noncombustible ceiling insulation,or 1/3 the depth Minimum Installation Distance(Spacing) Between <br /> of concealed space (as measured from the top surface of Sprinklers: <br /> the ceiling to the bottom of the deck above), whichever is 6 ft.(1.83 m) <br /> smaller(Refer to Figs.2&3). (Note:This minimum spacing does not apply to any ad- <br /> The CPVC piping can then be used to supply the Model ditional sprinklers that are required for protection of <br /> KFR-CCS Sprinklers, as well as the sprinklers installed be- CPVC piping that is offset over an obstruction) <br /> low the ceiling. Unless modified by this technical data sheet, <br /> all other guidelines provided by the CPVC pipe and fittings <br /> manufactures must be followed. <br /> 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.