My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21754
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 8:31:12 AM
Creation date
5/11/2020 8:22:16 AM
Metadata
Fields
Template:
Building Department
Company Name
PARK PLACE CENTER
Building Department - Doc Type
Permit
Permit #
19-21754
Building Department - Name
MARGOLIN,HOWARD REV TRST
Address
3795 CRREIA DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maximum Distance(Spacing) Between Sprinklers: composite wood joists**(Refer to Fig. 6) I <br /> 14 ft.(4.27 m)for concealed spaces that are less than 18" 4. Obstructed wood trusses; top chord more than 4" <br /> (457 mm)in depth. deep (Refer to Fig. 7). <br /> 16 ft.(4.88 m)for concealed spaces that are 18"(457 mm) **Note: In order to be considered "noncombustible insu- <br /> or more in depth lation-filled, solid wood or composite wood joists" <br /> Maximum Coverage Area Per Sprinkler: construction, the insulation (including insulation <br /> 196 ft2(18.2 m2)for concealed spaces are less than 18 in provided with a combustible vapor barrier), must <br /> (457 mm)in depth. completely fill the pockets between the joists to the <br /> 256 ft2 (23.8 m2) for concealed spaces constructed that bottom of the joists. Insulation installed above the <br /> are 18"(457 mm)or more in depth. elevation of Model KFR-CCS sprinklers in wood <br /> truss, solidwood joist or composite wood joist <br /> Note:Sprinkler spacing is determined by the depth of the must be secured into place with metal wire netting. <br /> concealed space at the location of the installation. The metal wire netting is intended to hold the insula- <br /> When transitions occur in the concealed space,the sprin- tion in place should the insulation become wet by <br /> klers may immediately be spaced at the largest approved the operation of Model KFR-CCS Sprinklers in the <br /> coverage area per the listing for the concealed space depth event of a fire. <br /> (Refer to Fig. 8) Concealed Space Area: <br /> Deflector Position: The area of the concealed space is not limited; however, <br /> At or below the bottom of the top chord; 1.5 in. (38 mm) for wood truss construction or concealed spaces of non- <br /> minimum to 4 in. (102mm)maximum below upper deck(or combustible bar joist construction(Refer to Fig.4)draft-cur- <br /> insulation if present)for wood truss construction or wood bar tains or full height walls must be provided at 1,000 ft2(93 m2) <br /> joist construction(Fig.2). areas.This draft curtain shall be at least 1/3 the depth of the <br /> 1.5 in.(38 mm)minimum to 4 in.(102mm)maximum below concealed space or.8 in. (203 mm), whichever is greater, <br /> bottom of insulation for noncombustible insulation-filled solid and be constructed using a material that will not allow heat <br /> or composite joist construction(Fig.3). to escape through or above the draft curtain. <br /> Minimum Distance Away From Face of Wood Truss For solid wood joist construction(Refer to Fig. 5) and ob- <br /> a I <br /> or Top Chord a Bar Joist structed wood truss construction(Refer to Fig. 7), blocking <br /> must be provide in each upper deck and ceiling joist chan- <br /> 4.5 in.(114 mm)(Refer to Fig.2) nel at a maximum 32 ft.(9.75 m)intervals.This blocking shall <br /> Remote Area: be installed to the full depth of the joist and be installed so as <br /> 1,000 ft2(92.90 m2) to not allow heat to escape through or above the blocking. <br /> (Note: Additional sprinklers that are required for protec- The blocking must be constructed using a noncombustible <br /> tion of CPVC piping that is offset over an obstruc- material. Draft curtains must be protrude below the joist a <br /> tion do not need to be included in the remote area.) minimum of 6 in. (152 mm) or 1/3 the space,whichever is <br /> Required Density: greatest and run parallel with the joist spaced at 31 ft.(9.45 <br /> 0.10 gpm/ft2(4.08 Lpm/m2) m)width maximum to limit the area to a maximum of 1,000 <br /> ft2(93 m2).The draft curtain may be constructed of 1/4 in.(6.4 <br /> Minimum Operating Pressure: m)plywood to prevent heat from escaping beyond the area. <br /> 7 psi (0.48 bar) For noncombustible insulation-filled, solid wood joist or <br /> Obstruction Rules: composite wood joist construction (Refer to Fig. 6), the re- <br /> All obstruction criteria per the applicable version of NFPA quirement for draft curtains or blocking does not apply. <br /> 13 apply, unless modified by this Bulletin (Refer to Fig. 7). Concealed Space Size: <br /> The KFR-CCS is classified as an Extended Coverage Up- The Model KFR-CCS sprinkler is specifically listed for use <br /> right Spray Sprinkler when installed in locations where the in horizontal combustible concealed spaces with a slope not <br /> maximum coverage area per sprinkler exceeds 225 ft2(20.9 exceeding 2 in 12 with combustible wood truss,wood joist <br /> M.The KFR-CCS is classified as a Standard Upright Spray construction,or bar joist construction having a combustible <br /> Sprinkler when installed in locations where the maximum upper surface and where the depth of the space is less than <br /> I coverage area per sprinkler is 225 ft2(20.9 m2)or less. 36 in (914 mm) from deck to deck, from deck to ceiling,or <br /> B. Steel Pil2e Systems(Refer to Figs 4.5 6 &7) with double wood joist construction with a maximum of 36 <br /> The Model KFR-CCS Sprinkler is designed to be in- in.(914 m)between the top of the bottom joist and bottom of <br /> stalled into steel pipe sprinkler systems. It is listed to the upper joist. NFPA 13 permits the use of the Model KFR- <br /> provide fire sprinkler protection of combustible con- CCS sprinkler(a) where the space is less than 12 in (305 <br /> cealed areas where the construction methods consist of; mm)from deck to deck or deck to ceiling,and/or(b)where <br /> a portion of the protected space exceeds 36 in.(914 mm). <br /> 1. Wood trusses or wood bar joists(Refer to Fig. 4) System Type: <br /> 2. Solid wood joist construction where the upper ceil- Light hazard,wet or dry pipe system. <br /> ing joists may have a maximum depth of 12 in. Minimum Installation Distance(Spacing) Between <br /> (305 mm). (Refer to Fig. 5). ( P g) <br /> 3. Noncombustible insulation-filled, solid wood or Sprinklers: <br /> 6 ft.(1.83 m) <br /> 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.