Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.'11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots.shall be sodded before final ait least 10 <br /> feet around'the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with"a minimum thermal resistance (R-value) of R-3.shall be applied to the <br /> following: <br /> Piping 31, inch (19.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation-systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O; <br /> 26 A cony of the enerj y tack shall be with permit at all thnes <br /> 27 Copy of final'insulatioiz report shall be provided with hermit before final <br /> 28. No fence, pool or enclosure Is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code Ob Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />