Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 0fthe 201. N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25..R403.5.3Hot water pipe insulation <br /> insulation for hot water pipe Withh-a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31, inch (1.9.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to:a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O: <br /> 26.A copy of the energy cacls shall be with permit at all times <br /> 27. Copy offinal insulation reportsliall-be provided with permit before final <br /> 28. No fence,pool or screen enclosure -is issued with:thisPermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t`Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />