Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.31HIot water pipe insulation <br /> insulation for hot.water pipe with a minimum thermal resistance (R-value) of R-3 shall. be applied to the <br /> following: <br /> Piping.314 inch (19.1.mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space:m Piping fro the water heater to:a distribution manifold: <br /> Piping located under a floor slab.. <br /> Buried in piping, <br /> Supply and return-piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shag be provided before C,O. <br /> 26. A copy of the efterzy cacls shall be with permit at all times <br /> 27. Copu of final-insulation report shall be provided with permit before final <br /> 28. No Lowe,pool or screen enclosure:is issued with This Permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />