My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22170
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:52:58 AM
Creation date
2/17/2021 10:44:10 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-22170
Building Department - Name
GONZALEZ,AUSTIN SCOTT & SCARLET
Address
6694 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCK-IT SYSTCM 4;0 1nSTaLL <br /> Y 'MSB1{7 a-11,� <br /> J <br /> tit <br /> r� <br /> t <br /> `e <br /> i <br /> i9. <br /> Fig.A <br /> 1 Install EcoFasten.Solar Flashing with Rock-it,Mounts . <br /> •Follow Ecorasten Solar Install Instructions fWashIng and bracket Install(GreenFasten shown above). <br /> •Optimum vertical distancebetvaeen lag boks is 1 Wplus module cirmenslon. <br /> Set mounts on eave most row sothatthe Rodcat Pedestal is on theSouth end of Rock-ItSlide-' <br /> •-Set mounts on all upper mws so that the Rock It Pedestal Is on the North end of Rock-It slide <br /> 2 Install"Rock-It Array Skirt onto Eave Mounts <br /> Slide Rock-It Array Skirt Into front channel on Rock-It Shelf. <br /> Array Skirt End,Caps are pre,-installed an the East end of each skirt section,and are used to couple the skirt sections where needed(see Fig.A). <br /> Tighten Mid-Clamp bolt,clamping Rock-It Array Skirt to mount:Torque to 200lrr4bs(130In-lbs.when Installing with 32mm modules). <br /> _ Install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot Is required) <br /> 34 <br /> "Prior to mounting on the roof,snap Load Bearing Foot Into the bottom of.Rock-It Coupling If required.. <br /> (Each Load Bearing Foot is set to same height as the Rock-It Mounts.-adjust accordingly) <br /> •.On eave row only,slide Rock=lt Array Skirt onto Rock-It Coupling Shelf.Torque to specified value <br /> • NOTE:If a coupling lands on a rafter,the Hybrid Mounte should be used In place of the Rock-It Coupling(refer to image 3a). <br /> *Hybrid Mount can be made in the field by assembling a coupling to amount Pedestal,or by purchasing separately. <br /> 5 Align and Straighten'First Row of.the Rock-It System with Rock-It Array Skirt <br /> •Use North-South adjustmentoftheRock-ItPedestaltostraightenRock4tArraySkirtandalignmodulewithArraySk(rt. <br /> •Torque screw.on side of Rock-It Pedestal to 150 In4bs to secure It to the Rock-It Slide. <br /> •Adjust Flange Level Nut to level the system(optional—can be leveled during or after installation). <br /> 6 '9 Install 1st Row of PV Modules- <br /> Slide upslope Rock-It Mounts down to engage top ci e ffirstmodul <br /> •Install Rock-It Couplings'on the upslope side of 1st row of panels. <br /> •Torque 2nd row ofIVIld4ampson Rock-it Mounts and RocMt Couplings to specified value. <br /> •Install balance ofPV modules,ensuring that the Rock-ft Peclestah am In the appropriate.position,then torque Mld-Camps to secure modules. <br /> . O Level the Rock-It System <br /> --When assembly Is complete;level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3'or less,when Installed with Type 2 modules <br /> INSTALLATION NOTE:Modules should.be'Installed so that the Junction box is installed upslope,away from the lead Ing-edgeof the array. <br /> www.ecofastensolarcom info@ecofastensoiarcom 877-859-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.