My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22170
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 10:52:58 AM
Creation date
2/17/2021 10:44:10 AM
Metadata
Fields
Template:
Building Department
Company Name
SILVERADO
Building Department - Doc Type
Permit
Permit #
19-22170
Building Department - Name
GONZALEZ,AUSTIN SCOTT & SCARLET
Address
6694 WAGON TRAIL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GrounDnGmFormaTlon <br /> The rail-free Rock-It System maybe used to mount and ground PV modules that comply with UL.1703,onlywhen that specific module has been <br /> evaluated for mounting and grounding,In compliance With the included installation Instructions. <br /> Note:Grounding lug must be visible to inspectors from-the entire perimeter of the PV-array. <br /> Multiple Use Grounding Pins <br /> Grounding pins within the Mid-Clamp are multiple use bonding/grounding devices.Modules will need to Wadjusted if th#Mid--Clamps are <br /> loosened to ensure there isnew"metA to pierce into upon retightening. <br /> Grounding Method <br /> Rock4t 4.0 Mount bonds N-S rows of.modules <br /> Rock-It 4.0 Coupling bonds EV rows of modules <br /> Rock-it Array Skirt bonds E-Walong'fhe entire array when installed <br /> One lilurndyCI_50-ITN ground lug Is required per PV array,limited to 300 modules placed In either portrait or landscape orientation, <br /> BonDnG ASSeMBL-YanD BOnDinG PaTH <br /> Sond Path <br /> Grounding Lug <br /> Integrated Bonding <br /> gmnne <br /> o3 RoCk-ItCcupling <br /> .10'Rock-it MOJM <br /> —Rock4,.May Skirt <br /> Bond Path Bond path <br /> Grounding Luga ip'Gromfing Lug <br /> EQUIamen-Groundtrz <br /> ,,VGroW ng <br /> (EGO, <br /> t0ourth <br /> Rock-Ir coupling so Rcck-It Coupling <br /> a Rock-it Mount, <br /> Rock-it Array Skirt 8 Rock4t Mount <br /> —Rock-It Array Skirt' <br /> vvww.ec:ofas:tensolar.corn lnfo@ecofastensolar.com 877-859-3947 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.