Laserfiche WebLink
THermaL EXPansion anD' BonDinG <br /> A thermal expansion gap is required per <br /> each continuous 40'length.of modules. — Bond-Path <br /> Grounding Lug <br /> Omit a coupling and leave a 2"gap in <br /> the Rock-It Array Skirt and also between / E2� r""�`$ <br /> -the-modules at that point. 8g= d <br /> m Rock-It Coupling <br /> ■ Rock-it Mount <br /> -Rock.-It Array skirt <br /> BracKeT spacinG <br /> Portrait Orientation- Landscape Orientation <br /> II � II <br /> f i , <br /> i. <br /> I , <br /> Maximum east/west bracket spacing is 48"OC. Max east/west bracket spacing is 72"OC. <br /> 32mm modules:Max east/west bracket spacing,Is 48"OC. <br /> Spacing may vary depending upon project specific structural requirements'i.e.:high snow and wind load <br /> areas may require lesser spacing E-W than'the maximum.. <br /> sTaG.Ge reD LaY.OUT canTLLever an.D oFFseT <br /> Staggered Mounting:Points. <br /> r <br /> ®Rock-It Mount Rock-it Coupling Cantilever: Maximum cantilever is 1/3 bracket spacing..For portrait <br /> orientation installations,check layout.prior to installing. <br /> •The array layout instructions in this Installation manual offer a <br /> general overview of layout. Periodically,.due to a variety of Offset:Offset from all roof edges depends on wind speed,snow <br /> factors(roof obstacles,shading,etc.)other layouts are required. loads,local fire and building codes per location <br /> www.ecofastensolar.com info@ecofastensolarcom 877-859-3947 -14 <br />