My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-22071
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-22071
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 11:06:02 AM
Creation date
2/17/2021 11:41:56 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
19-22071
Building Department - Name
WARREN,WILLIAM & KATHLEEN
Address
39031 3RD AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCK-IT SJ-STeI'1"1 4,0 inSTaLL <br /> ON <br /> 7. <br /> PWA <br /> a <br /> ' 1 � <br /> J <br /> ' 1 <br /> Fig.A <br /> Install EcoFasten.Solar Flashing with Rock-It.Mounts <br /> •Follow EcoFastanSolminstalllnstructionsforflashing and bradrethntall(GreenFasten shown above). <br /> •Optimum vertical dlstancebetween lag bolts is13Wplus module dimension. <br /> •Set mounts on eave most row sothat the Rock-It Pedestal is on the South end of Rock-It Slide. <br /> •-Set mounts on all upper rows so that the Rock:lt Pedestal Is on the North end of Rode-R Slide <br /> 2 Install Rock-It Array Skirt onto Eave Mounts <br /> • Slide Rock-It Array Skirt Into front channel on Rock-It Shelf. <br /> • Array Skirt End Caps are pre-installed on the East end of each skirt section,and are used to couple the skirt sections where needed(see Fig.A). <br /> •Tighten Mid-Clamp bolt,clamping Rock-It Array Skirt to mount:Torque to 2001n4bs.(130 in-Ibs.when installing with 32mm modules). <br /> 3_4 Install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot Is required) <br /> • Prlor'to mounting on the roof,snap Load Bearing Foot into the bottom of Rock-It Coupling If required. <br /> (Each Load Bearing Foot is set to same height as the Rock-It Mounts-adjust accoidingly) <br /> •.On.eave rowonly,slide Rock-It Array Skirt onto Rock-It coupling Shelf.Torque to specified value. <br /> • NOTE:If a coupling lands on a rafter,the Hybrid Mount'should be used in place of the Rock-It coupling(refer to image 3a): <br /> 'Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal;or by purchasing separately. <br /> 5Align and Straighten"First Row of.the"Rock-It System with Rock-It Array Skirt <br /> •UseNorth-&uth adjustment oftheRock-it Pedestal to straighten Rock-It Array Skirt and align module with Array SkIrL <br /> •Torque screw on side of Rock-It Pedestal to 150ln4bs to secure it to the Rock-It slide. <br /> Adjust Flange Level Nut to level the system(optional—can be leveled during or after installation). <br /> 6-9 Install 1st Row of PV Modules. <br /> •Slide upslopeRock-t Mounts down to engage top offirstmodule. <br /> •Install Rock=lteoupltngson the upsiopesideoflst row ofpanels. <br /> •Toque 2nd row of MidClamps on Rock-It Mounts and Rock-It couplings to specified value. <br /> •Install balance ofPV modules,ensuring thatthe Rodc4t Pedestals aye In the appropriate position,then torque Mid-Camps to secure modules. " <br /> 10 Level the Rock-It System <br /> •When assembly Is complete,level the entire system by adjusting Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3'orless,when Installed with Type 2 modules. <br /> INSTALLATION NOTE:Modules should.be installed so that the-Junction box Is installed upslope,away.from the leading edge of the array. <br /> www.ecofastensolarcom info@ecofastensolarcom 877-859-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.