Laserfiche WebLink
Employee: <br /> - Normal working hour rate - $25.00 per hour, per employee. Charged in half-hour <br /> increments <br /> Equipment (employee NOT included in cost): <br /> - Vehicles (car, standard and/or utility truck, or similar) $20.00 per hour, per vehicle. <br /> Charged in half-hour increments. <br /> - Specialty Vehicles (Crane Truck, TV Truck, Flat Bed Truck, or similar) $75.00 per <br /> hour. Charged in half-hour increments. <br /> - Heavy Equipment (VacCon, Mini-Excavator, Backhoe, Loader, or similar) $100.00 <br /> per hour, per piece of equipment. Charged in half-hour increments. <br /> Materials: <br /> - All materials used for repair, replacement, etc. shall be charged to the organization, <br /> resident, insurance company, etc. at the City's cost(s), plus 10% (ten percent) for <br /> Administration Fee. <br /> ***Rest of Page Intentionally Left Blank**` <br />