My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
776-21 Utility Department Fee Schedule
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
RESOLUTIONS
>
2021
>
776-21 Utility Department Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 3:25:03 PM
Creation date
3/23/2021 3:25:03 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Installation Fee Schedule <br /> 4"connection to existing Sewer Gravity Main<5'deep <br /> (same side of road, no asphalt cuts or repair required) <br /> Item Qty Hr Rate Subtotal <br /> Heavy Equipment Charge (Per Hour) 8 $ 100.00 $ 800.00 <br /> Employee Labor Charge (Per Hour) 24 $ 25.00 $ 600.00 <br /> Service Vehicle Charge (Per Hour) 16 $ 20.00 $ 320.00 <br /> Parts&Materials Bundled $ 250.00 <br /> Total* $ 1,970.00 <br /> 4" connection to existing Sewer Gravity Main >5' deep <br /> (same side of road,no asphalt cuts or repair required) <br /> Item Qty Hr Rate Subtotal <br /> Heavy Equipment Charge(Per Hour) 16 $ 100.00 $ 1,600.00 <br /> Employee Labor Charge (Per Hour) 36 $ 25.00 $ 900.00 <br /> Service Vehicle Charge (Per Hour) 16 $ 20.00 $ 320.00 <br /> Parts&Materials Bundled $ 250.00 <br /> Total* $ 3,070.00 <br /> 6"connection to existing Sewer Gravity Main<5'deep <br /> (same side of road,no asphalt cuts or repair required) <br /> Item Qty Hr Rate Subtotal <br /> Heavy Equipment Charge(Per Hour) 8 $100.00 $ 800.00 <br /> Employee Labor Charge (Per Hour) 24 $ 25.00 $ 600.00 <br /> Service Vehicle Charge (Per Hour) 16 $ 20.00 $ 320.00 <br /> Parts& Materials Bundled $ 500.00 <br /> Total* $ 2,220.00 <br /> 6"connection to existing Sewer Gravity Main>5'deep <br /> (same side of road, no asphalt cuts or repair required) <br /> Item Qty Hr Rate Subtotal <br /> Heavy Equipment Charge (Per Hour) 16 $ 100.00 $ 1,600.00 <br /> Employee Labor Charge (Per Hour) 36 $ 25.00 $ 900.00 <br /> Service Vehicle Charge (Per Hour) 16 $ 20.00 $ 320.00 <br /> Parts& Materials Bundled $ 500.00 <br /> Total* $ 3,320.00 <br /> Additional costs if roadway must be excavated to make the proposed sewer <br /> connection (Calculated for a 5'wide cut 24' long) <br /> Item Qty Hr Rate Subtotal <br /> Heavy Equipment Charge(Per Hour) 3 $ 100.00 $ 300.00 <br /> Employee Labor Charge (Per Hour) 6 $ 25.00 $ 150.00 <br /> Service Vehicle Charge (Per Hour) 3 $ 20.00 $ 60.00 <br /> Streets Heavy Equip Charge (Per Hour) 10 $ 100.00 $ 1,000.00 <br /> Streets Labor Charge(Per Hour) 12 $ 25.00 $ 300.00 <br /> Streets Service Vehicle Chg(Per Hour) 4 $ 20.00 $ 80.00 <br /> Asphalt&Limerock Bundled $ 375.00 <br /> Total^ $ 2,265.00 <br /> •Assumes that the new service connection will not require a paved road to be excavated.If road excavation Is necessary,additional fees will be applicable. <br /> ^Assumes aggregate material costs do not rise significantly above 2016 market rate <br />
The URL can be used to link to this page
Your browser does not support the video tag.