Laserfiche WebLink
i <br /> E^NGINEERING SCIENCES <br /> _ I Consultants In;Geotechnlcal Engineering•Eriviionmental Sciences <br /> _ Geophysical Services•Construction Materials Testing•Threshold Inspection <br /> Building Inspection•Plan Review•Building Code Administration <br /> UES CM Visual Inspection Report <br /> Project No: 0810.1900309.0000 Date: J.une_24,2020 - <br /> Project Name: _Zephyr Commons Storage- _ Client: Zephyr Self Storage <br /> Superintendent: _Tony Price - _ i Company: ._J Raymond Const. <br /> Erection Company: Rapid ._Work Order No.: 123060 <br /> - - <br /> UES Inspector:_-Jay Nunes,Certifed Welding Inspector,#16010811 — -___-.. -- —__.-- - _- <br /> - --- _ -- - ---- --- <br /> Area Observed Main Building_.A_ ; Out-Buildings B,,C;D,E and.F_ _ <br /> Structural Elements Visually Inspected_:- Project Completion percentage; <br /> %Accepted %Rejected <br /> X Decking: X screws )( Lap Screws Pinned 100% <br /> ram:Joists Welds: Embed Beam Girder — <br /> Joist Bridging Welds: <br /> Girder: Bolts Welds/Column Welds/Embed <br /> -X`-"A325%"Beam Bolts: Main_Bui_I_ding-A_ - <br /> X Perimeter Angle: '-All Main and Out-Building.Locations <br /> X Column Anchor Bolts: Main BuildingA_ 100% <br /> RTUIRoof Openings: - <br /> X Other: l t Floor Fasteners All Main andb0 <br /> Bui_i_ding Locations_ 100% <br /> X Other: 2"d=Floor Fasteners Main Building 100% <br /> Other - <br /> Other: -- -- ---- -- _ <br /> _=X Post Erection Inspection Re-inspection _ X ,Final,lnspec#ic1 <br /> Remarks: <br /> 1) Floor and Roof Deck Screws and Lap Screws,All Main and Out-Building Locations;Accepted 100% <br /> 2) A325Y/'_'_Beam Bolts,,Main Budding A;Accepted 206% <br /> 3) Perimeter Angle,All Main and Out-Build ngLocations Accepted 1QQ91G _ _... <br /> 4) Column Anchor Bolts, .Main Buiiding A-Accepted(_1C101 <br /> Floor Fasteners and Frame Bolts,All Main and Out-Building Locations;Accepted_lOQ%.. <br /> 6) 2"d Floor Fasteners and Frame Bolts,Main Building A,Accepted - <br /> Field Copy to: Tony Price <br /> Note:Final Inspection issued upon 100%completion of all inspections. <br /> i <br /> i <br /> All work inspected this day was found to be in conformance with the Contract Documents <br /> and the AWS D1.1-16 Structural,Welding code. <br /> Excluding the deviations/dei5cienc7es noted herein. 6 <br /> V '..Jay, <br /> ue i911<` <br /> 9802 Palm River Rd,Tampa, FL 33619 •($13)740-8506 <br /> www.UnivemalEngineeiing.com <br />