My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
19-21985
Zephyrhills
>
Building Department
>
Permits
>
2019
>
19-21985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 8:12:30 AM
Creation date
3/24/2021 11:47:07 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
19-21985
Building Department - Name
SF ZEPHYR COMMONS OUTPARCELS LP
Address
38011 PRETTY POND RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P obr <br /> UNIVERSAL.. <br /> ENGINEERING SCIENCES,NCES, INC. <br /> 1 Consultants In:Gootechnical Engineering 9 Environmental Sciences <br /> Construction Materials Testing a Threshold Inspection 0 Private Provider Inspection <br /> 9802 Palm River Road--*-Tampa, FL33619 9-Ph-1813) 7-46.466.6.,-.6-Fax(813) 740-8706 <br /> June 24th, 2020 <br /> Zephyr Commons Storage, LP <br /> 400 Clematis Street Suite 201 <br /> West Palm Beach, FL 33401 <br /> Attention: Todd Addison <br /> Reference: Zephyr Self Storage <br /> Gall Blvd Pretty Pond Road, <br /> Zephyrhills, FL <br /> UES Project No. 0810.1900309.0000 <br /> Dear Mr.Addison: <br /> STRUCTURAL STEEL BOLTED&WELDED CONNECTIONS <br /> This will verify that Universal Engineering Sciences was retained by Zephyr Commons Storage <br /> to provide visual and non-destructive examination of the Structural steel connections for the <br /> referenced project. <br /> �We- st anda4 inspecti I*---'-*--'-'- With <br /> _qra compliance <br /> '—fl-i"' , the <br /> the project requ r,-,- ry-st dri". <br /> bt:'_I'effi6htS. W, 6,A6:mtacbeptthq-�gv;. an(qo , the do <br /> we re ieve <br /> Genera) dq"ti,� <br /> `--t" -f 'his iresgbnsi lity 16 rvduce;,a completed WV PrOje0l conf,6,0Tng <br /> to the <br /> approved project plans and specifications. <br /> r0i <br /> It is our professional opinion that the structural steel connections were constructed in general <br /> compliance to the approved construction plans and project specifications. <br /> We trust this conformance letter is acceptable to your current needs. If you should have any <br /> questions, please contact us. <br /> Respectfully submitted, <br /> UNIVERSAL ENGINEERING SCIENCES, INC. <br /> Certificate of Authorization No. 00000549 <br /> -.0 <br /> Mark Hardy, <br /> 09jo <br /> _�a a <br /> t'i-"h:% <br /> 4 ?2:32- <br /> PE ft": <br /> Datei. 7�-1 <br /> 7 <br /> 'N <br /> NAL- <br /> AN <br />
The URL can be used to link to this page
Your browser does not support the video tag.