Laserfiche WebLink
• > 11/26/2019 TUE 8: 08 AM> LELAND A: <br /> Verify if work can begin at site. Has all demo of walls coverings, ceilings, and <br /> 'insulation been removed? Is site ready to do the electrical rough-in? Confirm the <br /> best panel/meter location. Take in to account the service drop location. May need <br /> to relocate the meter to the other side of the home. Make a layout drawing while on <br /> site. <br /> > 12/3/2019 TUE 8:38 AM> justin s: <br /> Richard Brown 813-731-7591 <br /> Customer needs to know when start date is? <br /> 12/3/2019 Tech Mike L <br /> Tech went to location to see if builing was ready for repairs. Tech stated that <br /> demo still has not happened and waiting for demo to happen to start repairs. > <br /> 12/4/2019 WED 10:05 AM> Justin S: <br /> Richard Brown called in stating that he will call back once the cleanup process is <br /> completed. <br /> > 12/12/2019 THU 3:32 PM> ROBERTO C: <br /> Richard B advised that demo & cleanup is complete. Ready for electrician to return. <br /> Back door, Lockbox Code: 5309 <br /> > 12/19/2019 THU 10:27 AM> LELAND A: <br /> Met with Richard on site to discuss the amount cf wall coverings and drywall that <br /> needed to be removed. The proposal states that all of the wall coverings and <br /> ceilings would be removed for the electrical work to be completed. I discussed with <br /> Richard that all material needed to be removed from at least one side of all <br /> interior walls, the interior coverings of all walls shared with the exterior, and <br /> all of the ceilings except the back halves of the bedrooms. If the wall or ceiling <br /> material thickness that remains exceeds 1/2" of total thickness, additional work <br /> and materilas will be necessary to install code compliant outlet boxes. <br /> •• Richard stated that he would be removing the remaining wall covering and ceiling <br /> materials. <br /> Richard requested that Pattie Electric provide the electrical demo to remove all <br /> existing electrical components from the buildin . <br /> Richard stated that he did not have a mechanical contractor to provide roof vents <br /> and ducting for the new bathroom and kitchen exhaust fans and requested that Pattie <br /> Electric provide the code compliant installatior of the mechanical equipment. <br /> > 12/2/2019 FRI 10:45 AM> LELAND A: <br /> Needs Permit and NOC <br /> > 12/23/2019 MON 10:45 AM> LELAND A: <br /> Electrical demo work scheduled for AA on 12/24/ 9 first ticket <br /> Price is Per Stated Quote 1.00 7600.00 7600.00 <br /> Page 3 of 4 <br />