Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 40 .11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R.-value) of R-3 shall.be applied to the <br /> following: <br /> Piping V4 inch (.19.1 mm)and larger in nominal diameter <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water heater to a distribution manifold.. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A c.o&of the-efterry cacls shall be with Permit at all times. <br /> 27. CopV o fhal_insulation re ort shall be ProWded ivitir Permit Wore Linab <br /> 28. Nofence, Pool or screen enclosure :is issued with'th s permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />