Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 40 .I I of the 2016 N.E.0 <br /> 24. In accordance with the Land Develop_meet Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-.-R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping-1. inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located.outside the conditioned space:, <br /> Piping from the water heater to.a distribution manifold.. <br /> Piping located under a floor-slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A copo the energy cacls shall be with permit at al times <br /> 27. Co o . trial insulation re port shall be rovided wit ermit before trial <br /> 28:No fence ool or screen enclosure':is issued with:th spermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act. N.E.C.-"National Electric Code (2016) <br />