Laserfiche WebLink
'4 <br /> 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.-E.0 <br /> 24. In accordance with the'Larid Development Code,lots shall be sodded before_ final at least 10 <br /> feet around the structure.- <br /> 25. R403.5.3Hot Water.pipe insulation . <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> follo'w' ing: <br /> Piping:3/:inch (1.9.1 mm) and larger_in nominal diameter.. <br /> Piping.serving more than:one dwelling unit. <br /> Piping located outside'the conditioned space.. <br /> Piping from the water heater to a distribution manifold, <br /> Piping-located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.'Blower. door test shall be provided before C.O: <br /> 26.A copy of the energy eacis shall be ivith peewit at all times <br /> 2Z Copt/offnal insulation report shall be provided with permit before final <br /> 28.No fence, pool or screen enclosure .is issued wiWthispermix <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A. Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />