My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22365
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 1:22:05 PM
Creation date
3/29/2021 1:22:03 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE
Building Department - Doc Type
Permit
Permit #
20-22365
Building Department - Name
EMERALD POINTE PROPERTY HOA
Address
39602 AMETHYST WAY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y tert k <br /> Total.Quatity Assured. <br /> Test Report Number: SZ-HH01291781 <br /> Tests Conducted <br /> est i'�,�»s"���Ct�"�ian' R i a t 1 tttml't Reis 1t <br /> Metal Surfaces Visual Check All metal'surtaces are plated coated,or equivalent P <br /> to.inhiibit corrosion. . <br /> Head and Neck ASTM F1148-17, Shall..be designed and constructed so:that when P <br /> Entrapment Section 6.1 assembled any accessible opening shall mrneet"the <br /> (Modified) requirements specked in this section to reduce the <br /> risk of accidental head or neck entrapment by either <br /> a head first or feet first entry into the opening. <br /> C?penings between the ground and the bottom edge <br /> of the equipment are exempted from this <br /> ce uieement. <br /> Performance <br /> Functionality Client's Shall function as intended as receiVed.Report P <br /> Requirement details of evaluation(features tested 1 methods used <br /> 1 materials tested etc.)if not alrea d dy covered by <br /> other tests.,Additional charge and samples may be <br /> re Lired"fors ecial.features. <br /> *Ease of Assembly Actual Use Follow the instructiiins"to'"assernble;comment on the P <br /> method of the'installation.Parts shall not easy to <br /> break ddrinq normal assetnb{ . <br /> Assembled Product Visual Check Products requiring assembly have to be inspected P <br /> after proper assembly for any aesthetic deficiencies <br /> including but not limited to pieces that do not align, <br /> are not level or straight.All non-conformance shall <br /> result in clause failure with photo(s)attached in the <br /> report. <br /> Page 11 of 25 <br /> Intertek Testing Services Shenzhen Ltd. West Side of 1/F and 3,4,51E of Bldg.1,1-5/E of Bldg. Tel:+86755 26020111 <br /> 3,Yuiniheng Science and Technology industrial Fax:+86755 3537711819 <br /> Park,No.4012,Wuhe Ave.North,Bantian Street, WMIntertek.coil.cn <br /> Longgario District,Shenzhen www.intertek.com <br /> !!Yjffl1`ig-#f3-4-5r=-)A1*NMI*Ufa343.91 �f. <br /> 1-5 G- <br />
The URL can be used to link to this page
Your browser does not support the video tag.