My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-22365
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-22365
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 1:22:05 PM
Creation date
3/29/2021 1:22:03 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE
Building Department - Doc Type
Permit
Permit #
20-22365
Building Department - Name
EMERALD POINTE PROPERTY HOA
Address
39602 AMETHYST WAY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
htO k <br /> Tatal Quatiiy Assured. <br /> Test Report Number: SZHH01291781 <br /> Tests Conducted <br /> es Ite�i3s�tition a nt 1 �' l � es <br /> Stability As per Criteria Set up the gazebo as per ins#ructions; P <br /> -Measure the area of the projected <br /> .tide S(fe),refer <br /> #o cFiart below'using the.clairned wind speed the <br /> product can withstand(50 mph if no'daim)and load <br /> a pustiing:force F S x Lin the frame center and <br /> hold for 5 minutes; <br /> -The gazebo shell remain stable,no swaying or <br /> moving. <br /> end <br /> Speed <br /> m h . 40 45 50 55 60 65 <br /> Static <br /> Pressure 3.9 5.0 6.2 7.6 8.9 <br /> Iba::it . 93 .54 40 50 85 10.545 <br /> wrid <br /> Speed <br /> lir h . 70 75 80 85 1 90 .95 <br /> Static <br /> Presstjire' 12._ 14. 15. 18. 20. <br /> Ib/•ft` 230 040 974 033 217. 22.526 <br /> Wind <br /> Speed <br /> m h . 100 1 105 110 115 1 120, 125 <br /> Static <br /> Pressure 24 27 30. 33. 35. <br /> lb-!ft` 966 516 201 009 942 39.000 <br /> S:Area of the.side(fe) <br /> L:Static Pressure(lb/fe) <br /> F S x L Force.pulling onto the,side of thegazebo) <br /> Roof Snow Load As per Criteria Place a distributed load of the claimed snow loading P <br /> (use 10 lb/fte-,if no daims)on,this roof for 8 h.There <br /> shall be no damage to the roof top or permanent <br /> deformation of the frame. <br /> NOTE:does not apply to products that provide dear <br /> instructions of not leaving the structure erected <br /> during winter when snow is expected.If exempted <br /> from Roof.Sno*Load assessment,record the <br /> instructions on the re ort. <br /> I�IItl�l1��61®�1��1��9 <br /> Page 12 of 25 <br /> Intertek Testing Services Shenzhen Ltd. West Side of 1/F and 3,4,5/F of Bldg.1,1-5/F of Bldg. Tel:+86755 26020111 on <br /> #lfflfitlin� 3,Yuanzheng Science arid Technology industrial Fax:+86755 3537711819 <br /> Park;No.4012,Wuhe Ave.North,Bantian Street, www.intertek.com,cn <br /> Longgang District,Shenzhen wwwAntedeLcom <br /> IM7.A 4012-9-jcbT <br /> J&IM 1 3.4,5 MR&1 MMiI *R-*[I 3 1ajMV-jW, <br /> 1-5)-= <br />
The URL can be used to link to this page
Your browser does not support the video tag.