Laserfiche WebLink
.23. Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.-E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25:.R403.5.3Hot water-pipe insulation. <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3h inch (1.9.1 mm)and larger in.nominal diameter. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside'the conditioned space. <br /> Piping from the water heater to a distribution manifold., <br /> Piping:located under a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower.door test shall be provided before C,O: <br /> 26 A copy of the energy:cacls shall be with permit at all times <br /> 27. Copy of linaT insulation report-shall be provided with permit before rhzA <br /> 28:No fence,-pool onscreen enclosure 4&issued-with ahis_permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />