Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land_ Development Code,lots shall be sodded before_ final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot wate- pipe insulation <br /> Insulation for hot water. pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V.inch (19.1 mm)and larger in nominal diameter.- <br /> Piping serving more than one dwelling unit. <br /> Piping located.outside the conditioned space: <br /> Piping from the water heater to:a distribution manifold:. <br /> Piping located under a floor slab.. <br /> Buried in piping,: <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower door test shall be provided before C.O. <br /> 26.A copy of the enemy cacls shall be with permit at all times <br /> 27. CoPP offnal.insulation report shall be provided with permit'before rinal <br /> 28 No fence,pool or screen enclosure :is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code Oh Edition <br /> R.O.W.-Right of Way. <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />