Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.41 ofthe 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots.shall be sodded=before-final at least.10 <br /> feet around the structure: <br /> 25 .R403.5,3Hot water pipe insulation. <br /> Insulation for hot,water pipe with.a minimum thermal resistance (R-value) of R-3.shall.be applied to the <br /> following: . . <br /> Piping�14 inch (19.1 mm)and larger in.:nominal diameter: <br /> Piping,serving more than one dwelling unit. <br /> Piping located outside the conditioned space;. <br /> Piping from the water heater to a distribution manifold.. <br /> Piping:located.under.a floor slab. . <br /> Buried 'in piping, <br /> 'Supply and return piping in recirculation'systems other than demand recirculation systems. <br /> -25: Blower door test shall be provided before C.O. <br /> 26.A copy of the enemy_Gaels shall be with permit at all i7iMes <br /> 27.. Copy offinal insulation'-report shaft be provided with permit before fnaL <br /> 28. No fence, pool or screen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> RB.0 Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />