Laserfiche WebLink
Schedule 10 and Schedule 40 <br /> FM Approved and UL Listed Sprinkler Pipe <br /> Bull Moose Tube Company is a recognized producer Bull Moose Tube's Sch. 10 and Sch. 40 pipes are <br /> of quality pipe products. Our Schedule 10 and made to ASTM A135 and ASTM A795. These <br /> Schedule 40 are FM Approved and UL Listed (for U.S. products are typically supplied with our protective <br /> and Canada), even though these products do not coating but can be supplied without the coating so <br /> require separate approvals and listings. Bull Moose they can be hot-dip galvanized to meet FM <br /> Tube made the decision to have them approved and requirements for use in dry systems in accordance <br /> listed for your peace of mind. Our Sch. 10 and Sch. 40 with the zinc coating specifications of ASTM A795 or <br /> have been through the same rigorous testing as our ASTM A53. All Schedule 10 and Schedule 40 pipe <br /> other fine pipe products. has a pressure rating of 300 PSI. <br /> Schedule 10 Pipe <br /> 1 1.315 _ _ 1.097 1.41 Ibs/ft 91 <br /> 1-1/4 1.660 1.442 . i 1.81 Ibs/ft 61 <br /> 1 1/2 1.900 1.682 2.09 Ibs/ft 61 <br /> 157 2 _ 2.375 2. I. <br /> . - - -- - --- ,— . .. - . -. ---- :-. 12.64Ibs/ft _ f..-. 37 <br /> 21/2 2.875 2.635 :;_ 3.53lbs/ft 30 <br /> 3 _- 3.500 - 3.260 4.34 Ibs/ft 19 <br /> 4 4.500 4.260 5.62 Ibs/ft 19 <br /> Schedule 40 Pipe <br /> 9� i r t�,i�hs lWaVl <br /> 1.049 1.68 Ibs/ft _ 70 <br /> 1 1/4 1.660 1.380 2.27 Ibs/ft 51 <br /> 1 1/2 _- _ 1.900 -.: ; - _ 1.610 -- _=_- - 2.72_Ibs/ft _ i_. _ 44 <br /> 2 2.375 2.067 3.66 Ibs/ft 30 <br /> 2 1/2 2.875 - _ - { 2.468 _ 5.80_Lbs/ft _ 30 <br /> _ - - _ 3 - <br /> 3. 3.500 3.068 7.58 Ibs/ft 19 <br /> 4 4.500 4.026 10.80 Ibs/ft 19 <br /> PIPE PREPARATION <br /> For proper operation,all pipe surfaces should be cleaned prior to installation. In order to provide a leak-tight seat for the gasket,pipe surfaces should be <br /> free from indentations and projections from the end of the pipe to the groove. All loose paint,scale,dirt,chips,grease,and rust must be removed prior <br /> to installation. Failure to take these important steps may result in improper coupling assembly,causing leakage. Also,check the manufacturer's <br /> instructions for the specific fitting used. <br /> •� Clarkson Road For additional information, <br /> Chesterfield, <br /> C �L US J <br /> Chesterfield,MO 63017 contact your salesperson <br /> J BULL MO05E TUBE COMPANY (800)325-4467 today at(800)325-4467 or usna i—=---� <br /> C1 FAX:(636)537-2645 (636)537-2600 in the USA, <br /> www.bullinoosetube.com or from Canada Ae> <br /> A CA A O company e-mail:sales@bullmoosetube.com call(800)882-4666 <br /> e aPPnoveo <br /> All information contained herein is accurate as known at the time of publication. Bull Moose Tube reserves the right to change product specifications without notice and without incurring obligation. <br /> 12/09 <br />