Laserfiche WebLink
MECHARIGALLY ATTACHED ROOFING" <br /> °O e °VC <br /> 10.Expanded Polystyrene Insulation Fan-fold Re-cover Board E.Protect building surfaces against damage and contamination <br /> 3/8" (9.5 mm)with plastic facer meets or exceeds the from roofing work. <br /> requirements for ASTM C578,Type IX[min 25 psi(173 F.Where work must continue over completed roof areas,protect the <br /> kPa)compressive strength]. finished roofing system from damage. <br /> 11.Expanded Polystyrene Insulation Re-cover Board 1/2"(13 G.Deck preparation is the sole responsibility of the building owner <br /> mm)with plastic facer meets or exceeds the requirements or roofing contractor.All defects in the roof deck or substrate <br /> for ASTM C578,Type IX[min 25 psi(173 kPa)compressive must be corrected before roofing work commences. <br /> strength]. <br /> H.Refer to GAF Roof Guarantee Program for specific requirements <br /> for extended guarantees. <br /> 2.10 Base Sheets <br /> A.Not required. 3.02 Preparation Of Roofing Area—New&Tear-off <br /> Applications <br /> 2.11 Slip Sheet/Protection Layer A.Remove all existing roofing materials to the roof decking, <br /> A.EverGuard®Polymat slip sheet,3.0 o7,/sq.yd.(102 g/sq.m.). including flashings,metal edgings,drain leads,pipe boots,and <br /> pitch pockets,and clean substrate surfaces of all asphalt and <br /> B.EverGuard®Polymat cushioning slip sheet,6.0 o7,/sq.yd. adhesive contaminants. <br /> (203 g/sq.m). B.Confirm quality and condition of roof decking by visual <br /> C.GAF VersaShield®Solo—Fire-Resistant Slip Sheet. inspection and by fastener pull-out testing by an individual <br /> trained by the roof fastener manufacturer.GAF recommends <br /> these test results to be kept on file as part of the acceptability <br /> 2.12 Other Accessories of the substrate surface for a Diamond Pledge—NDL Roof <br /> A.The following items may also be required,depending on the Guarantee.Submission of results to GAF is not required. <br /> project: C.Secure all loose decking.Remove and replace all <br /> 1.Wood Nailers:New wood nailers must be#2 or better lumber. deteriorated decking. <br /> Do NOT use asphaltic or creosote-treated lumber. D.Remove abandoned equipment and equipment supports. <br /> 2.Roofing Nails:Galvanized or non-ferrous type and size as E.Confirm that height of equipment supports will allow the <br /> required to suit application. installation of full-height flashings. <br /> 3.Temporary Sealant:Polyurethane foam sealant or similar as F.Refer to Section 3.06 for air/vapor retarders. <br /> required to provide temporary watertight sealing of roofing. <br /> G.For extended-length guarantees,new roof construction or a tear- <br /> 4.Air/Vapor Barrier:Polyethylene sheeting,min.6 mil.for off is required.For tear-offs,remove all existing roofing materials <br /> TPO only. to the roof deck.This includes fleshings,metal edgings,drain <br /> 5.Fire Barrier:Gypsum panels,min.1/a"(6.3 mm)thick leads,pipe boots,and pitch pockets. <br /> (DensDeck®;DensDeck®Prime or SECUROCK—Roof <br /> Board). <br /> 3.03 Preparation Of Roofing Area—Re-cover Applications <br /> PART 3—EXECUTION A.Remove all surfacing and debris from the roof surface. <br /> B.Remove blisters and ridges from the roof membrane. <br /> 3.01 Site Conditions C.When re-covering over an existing single-ply roof,that roof must <br /> A.Obtain verification that the building structure can accommodate be first cut into maximum 10'x 10' (3 m x 3 m)areas before the <br /> the added weight of the new roofing system. application of new slip sheet and/or membrane. <br /> B.Confirm the adequacy of the new roofing system to provide 1.PVC must be separated from existing PVC roofs and other <br /> positive slope to drain.Eliminate ponding areas by the addition types of single-ply membranes and asphaltic membranes <br /> of drainage locations or by providing additional pitch to the roof that have active sealants,including asphalt cement,single- <br /> surface. ply adhesives,or other non-compatible materials.This <br /> C.Prepare substrate surfaces thoroughly prior to application of new can be accomplished by installing a polymat slip sheet, <br /> roofing materials.This is particularly important for re-cover and insulation,cover board,or fleece-back PVC membrane. <br /> reroofing applications.Providing a smooth,even,sound,clean, 2.Installation over an existing mechanically attached <br /> and dry substrate minimizes the likelihood that underlying membrane is only acceptable if all existing fasteners are <br /> deficiencies will cause premature deterioration or even failure of flush and do not cause ridging/tenting at the existing <br /> the new roofing system. membrane. <br /> D.All defects in the roof deck or substrate must be corrected by the D.Remove all existing flashings,including metal edgings,drain <br /> responsible parties before new roofing work commences.Verify leads,pipe boots,and pitch pockets,and clean substrate <br /> that the deck surface is dry,sound,clean,and smooth,and free surfaces of all asphalt and adhesive contaminants.If the wall/ <br /> of depressions,waves,or projections. curb flashings are in good condition and tightly adhered to the <br /> substrate,new TPO or PVC flashing materials may be installed <br /> over these to a height of 30" (762 mm)without adhesives for <br /> 41 <br />