Laserfiche WebLink
23. Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with theLand Development Code,lots shall be sodded before final at least.10 <br /> feet around the structure. <br /> 25: R403.5.31H[ot.water pipe insulation <br /> Insulation-for hot water pipe with a minimum thermal resistance (R-value) of,R-3 shall be applied to the <br /> following: <br /> Piping 31. inch (19.1 mm) and larger in.nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside'the conditioned space: <br /> Piping from the.water heater to:a distribution manifold:. <br /> Piping located under.a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A copy of the enemy cacls shall be with permit at all times <br /> 27. Cope of final insulation retiort shall be provided with Permit before fnah <br /> 28. No fence,-pool or screen enclosure :is issued with:th is.Perin it. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.0 Florida Building Code 6t'Edition . <br /> R.O.W.-Right of Way- <br /> A.D.A.=Americans with Disabilities Act . N.E.C.-National Electric Code (2016). <br />