My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1417-21 Gagne PUD Rezoning Master Plan Amendment
Zephyrhills
>
Administration
>
City Clerk
>
Vault Files
>
ORDINANCES
>
2021
>
1417-21 Gagne PUD Rezoning Master Plan Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 3:34:37 PM
Creation date
6/22/2021 3:34:35 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OR BK 10372 PG 776 Page 14 of 17 <br /> Exhibit "C" <br /> 7. Applicant/developer shall install as part of each phase of development a 10'wide multi- <br /> use trail along the south side of Chancey Road for the portion of such road that is adjacent <br /> to the subject development. If there is insufficient space for the construction of the trail <br /> within the right-of-way(after accounting for the proposed thru lanes,turn lanes and other <br /> improvements in the right-of-way),such trail may be located,in whole or in part,within the <br /> landscape buffer along Chancey Road for the project,provided that an easement is given <br /> to the City for the use of the multi-use path by the public prior to the Issuance of a certificate <br /> of occupancy for the applicable phase of development. <br /> 8. Street connections to Chancey Road and Paul S Buchman Road from the project shall be <br /> provided as shown on the Master Plan. Any additional right-of-way required for such <br /> connections may be required of Applicant/developer and construction of said <br /> improvements and not be entitled to transportation impact fee credits. <br /> 9. In the case of private streets,dedication and maintenance shall be the responsibility of an <br /> appropriate entity other than the City. City of Zephyrhills will not be responsible for the <br /> maintenance of any private streets. <br /> Design/Construction Specifications <br /> 10. If, during construction activities, any evidence of historic resources including, but not <br /> limited to,aboriginal or historic pottery,prehistoric stone tools,bone or shell tools,historic <br /> trash pits,or historic building foundation,are discovered,work shall come to an immediate <br /> stop, and the Florida Department of Historic Resources (State Historic Preservation <br /> Officer) and the City of Zephyrhills shall be notified within two working days of the <br /> resources found on the site. <br /> 11. As provided in Chapter 190,Florida Statutes,and subject to the City's separate approval, <br /> a CDD is hereby authorized to undertake the funding and construction of any of the <br /> projects,whether within or outside the boundaries of the CDD that are identified within this <br /> rezoning approval. Further, any obligations of the developer contained in this approval <br /> may be assigned to a CDD, homeowners'/property owners' association, or other entity <br /> approved by the County. However,such CDD shall not be authorized to levy assessments <br /> on any property either owned or to be owned by the City or School Board (Public <br /> Properties)that are located within the boundary of the CDD. All applicable documents <br /> pertaining to the undertaking of funding and construction by the CDD shall reflect the <br /> following: <br /> a. Public Properties shall not be considered benefited properties and shall not be <br /> assessed by the CDD. <br /> b. No debtor obligation of such CDD shall constitute a burden on any Public Property. <br /> Utilities!Water Service/Wastewater Disposal <br /> 12. Utility plans for the entire development shall be submitted to the Utilities Department for <br /> review and approval prior to or concurrent with submittal of the construction plans. This <br /> utility plan shall show,at a minimum,the following: <br /> a. Trunk sewer lines and lift stations. <br /> b. Main potable water lines and non-potable water lines,if applicable. <br /> c. Sewage treatment facility locations,including discussion of the proposed method <br /> of treatment and the feasibility of a non-potable water system for irrigation. <br /> d. The Utility plans shall include AutoCAD and PDF electronic files and hydraulic <br /> analysis for the water, wastewater, and reclaimed water systems within the <br /> proposed development. <br /> 13. The developer(s)shall construct all water and wastewater facilities within the development <br /> to current City standards.A complete set of standards may be obtained from the Utilities <br /> Department. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.