Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the,2016 N.E.0 <br /> 24. Iri accordance with the Land Development Code,lots shalt.be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water.pipe insulation <br /> Insulation for hot.water'pipe with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping 3/:inch (1.9.1 mm)and larger.in.nominal diameter._ <br /> Piping.serving more than one dwelling unit. <br /> Piping located outside'the conditioned'space. <br /> Piping from the.water heater to a_distribution manifold:. <br /> Piping located under,a floor slab. <br /> Buried in piping. . <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided;before C.O. <br /> 26.A copy of the_enerQy xacis shall be with permit at all times <br /> 27. Cope of final.insulation report shall be provided ivith permit before fnab <br /> 28.No fence,pool or screen enclosure :is issued_iwith This Permit. <br /> F.F.E.-Finished Floor Elevation <br /> FAC- Florida Building Code 6a' Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />