Laserfiche WebLink
i <br /> } 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> R403.5.3Hot water pipe insulation <br /> Insulation for.hot water pipe'with-a minimum thermal resistance (R-value) of R-3 shall be-applied to the <br /> following: <br /> Piping:V,inch (19.1_mm)and larger in.nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping Irom the:water'heater to.a distribution manifold: <br /> Piping.located under a floor slab:' <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower;door test shall be provided before C.O; <br /> 26.A copy ofthe energy.cacls shall be with permit at all times. <br /> 27. Conu of final insulation report shall be provided with permit before fnaL <br /> 28.-No fence.-,idol or screen enclosure .is issued with this.permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W'-Right of Way <br /> A.D:A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />