My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-775
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-775
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 1:51:21 PM
Creation date
2/27/2022 1:23:06 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-775
Building Department - Name
SANTOS,IDALIA
Address
39352 LINCOLN AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> ROCK-IT SYSTC f71 4.0 insTaLL <br /> •.tr y J <br /> ram'• _-- - •y •Y\�A - <br /> 7;a <br /> s � <br /> I . <br /> Fig.-A <br /> Install EcoFasten Solar Flashing with Rock-It.Mounts <br /> •FollowEaofastenSolarhsstallInsbucdomforflashing and braeiret install(GreenFasten shown above). <br /> •Optimum vertlmidlstancebetween lag bolts is1Wplus module dimension. <br /> •Set mounts on eave most raw sothat the Rock4t Pedestal Is on theSouth end ofRock-ft SlIde. <br /> •Set mounts on all upper rows so thatthe Rodc:lt Pedestal Is on the North end of Rodc-R Slide. <br /> 2 Install Rock-It Array Skirt onto Eave Mounts <br /> • Slide Rock-It Array Skirt Into front channel on Rock-It Shelf. <br /> •Array Skirt End Caps are pre-installed an the East end of each skirtsection,and are used to couple the skirt sections where needed(see Fig.A). <br /> Tighten Mid-Clamp bolt,clamping Rock-it Array Skirt to mount:Torque to 200 to ibs.(130 br-Ibs.when Installing with 32mm modules). <br /> 374 Install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing foot Is.requlred) <br /> Prior to mounting on the roof,snap Load Bearing Foot into the bottom of Rodc-It Coupling if required. <br /> (Each Load Bearing Foot is set to same height as the Rock-It Mounts-adjust accordingly) <br /> • On eave row only,slide Rock-It Array Skirt onto Rock-It Coupling Shelf.Torque to spedfled value. <br /> • NOTE:If a coupling lands on a rafter,the Hybrid Mount`should be used in place of the Rock-(t Coupling(refer to Image3a). <br /> 'Hybrid Mount can be made in the fleld,by assembling a coupling to amount pedestal;or by purchasing separately. <br /> 5 Align and Straighten First Row of the Rock-It System with Rock-It Array Skirt <br /> •Use North-South adjustment of the Rock-n Pedestal to straighten Rode @'Array Skirt and align module with Array SkkL <br /> -Torque screw.on side of Rode-It Pedestal to 150ln4bsto secure It to the Rode-it Slide. <br /> •Adjust Flange Level Nut to level the system(optional-can be leveled during or after Installation). <br /> 6-9 Install 1st Row of PV Modules <br /> •Slide upslope Rodr-It Mounts down to engage top offirstmodule. <br /> •Install Rock-ItCoupiingson the upslopesideoftst row afpanels. <br /> •Torque 2nd row ofMld-ClampsonRock-It Mounts and Rocklt Couplings to specified value. <br /> •Install balance ofPVmodules,ensudngthattheRock4tPedestaliareintheappropriateposition,thentorqueMid-0ampstosecuremodules <br /> Level the Rock-It System <br /> '� O <br /> • When assembly Is complete,level the entire system byadjust(ng'Flange Level Nuts(Flange Level Nuts have no torque value). <br /> • Helght between roof surface and underside of modules should be 3'or less,when installed with Type 2modulem <br /> INSTALLATION NOTE:Modules should be Installed so that the Junction box Is Installed upslope,away from the leading edge of the array. <br /> wwwecofastensolarcom info@ecofastensolarcom 877=859-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.