My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-775
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-775
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 1:51:21 PM
Creation date
2/27/2022 1:23:06 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-775
Building Department - Name
SANTOS,IDALIA
Address
39352 LINCOLN AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. <br /> GrounainG LUG insTaLLI <br /> .";k4 <br /> Necessary Components: <br /> - One of the following ground lugs(or any UL 2703,compliant ground lug), <br /> Burndy CL50-1TN Ground Lug(UL 2703-E35:1343./ UL 467-:E999% <br /> ILSCO SGB-4 Ground Lug(UL 2703-E354426/UL 467=E34440). <br /> ILSCO.GBL-4DBT(UL 2703-E354420 /UL 467-.E34440) <br /> ILSCO GBL-4DBTH(UL 2703-E354420 /UL 467-E34440) <br /> ILSCO GBL=4SS(UL 2703-E354420 /UL 467 E34440) <br /> Note:Drill and.deburr hole in Ground-Lug prior to installation <br /> - 14 AWG-4 AWG Copper Ground Wire* Torque Values: <br /> - 8-32 x 0.5"Serrated Flange Head Bolt(300 Series SS), 14-10'AWG=20 in-Ibs. <br /> - 8-32 Serrated Flange Nut(300 Series SS) 8 AWG=25 in-lbs, <br /> - 11/32°and.1/4"wrenches or ratchets/sockets 64AWG=35 in-Ibs. <br /> 1 Insert the flange bolt into the module-ground hole.Place Star Washer over bolt.Place ground lug over the bolt;and <br /> Star Washer,and turn to desired orientation. <br /> 2 install Flange Nut. <br /> 3 Tighten Flange Nut/Bolt. <br /> 4 Place wire in Ground Lug channel and tighten setscrew to complete assembly. <br /> *Wire should be sized In accordance with the Nationai:Electrical Code,-NFPA 70;Section 690.45,and a minimum of <br /> 1/4"clearance required between bare copper wire and aluminum. <br /> I ' Drill hole per grounding lug manufacturers <br /> specifications in the upslope-part of Rock-it Coupling. <br /> ..i - for attaching grounding lug. <br /> Note:Deburrhole in Ground Lug and Rock-it Coupling prior to Installation. <br /> www.ecofastensolar.com info@ecofastensolaccom 877-859=3947 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.