My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-775
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-775
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 1:51:21 PM
Creation date
2/27/2022 1:23:06 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-775
Building Department - Name
SANTOS,IDALIA
Address
39352 LINCOLN AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCK-IT CLIP SS i nSTa LL �Ac:enghte6lnunting�ocatksns <br /> . *nr_8onBox <br /> I <br /> 1. Locate all parts <br /> -Locate the Rock-It Clip SS,micro-inverter/power optimizer,and the section of the module.frame in which <br /> you will be mounting the micro:inverter/power optimizer.. <br /> See fig.A for acceptable.mounting locations. <br /> 2.Install the Rock-It Clip SS <br /> • Slide the-Rock-it Clip:SS onto the lip of the module frame. <br /> • Slide the micro-inverter/power optimizer into the opposite lip of the.Rock:it Clip SS.. <br /> • Tighten the bolt to 150 in-lb minumum to clamp the Rock-it Clip SS to the module frame and the <br /> micro-inverter/power optimizer to the Rock-,'It Clip SS. <br /> • Ensure that the lip on the clip-is tight against the frame and that the micro-inverter/power optimizer flange is <br /> tight against the clip flange to avoid rotation during tightening. <br /> ROCK-IT CLIP 2.O inSTaLL <br /> i <br /> Inverter Flange <br /> "-A <br /> Mod ute Frame <br /> Rock-lt-Clip 2.0 <br /> 1 Locate all parts <br /> -Locate the Rock-It Clip 2.0,micro-inverter/powe'r optimizer,and the section of the module frame in which you <br /> Will be mounting the micro-inverter/power optimizer. <br /> 2 Install the Rock-It Clip 2.0(See below detail) <br /> • Slide the Rock-It Clip 2.0 onto the lip of the micro-inverter/power optimizer. <br /> • Slide the micro-inverter/power-optimizer into the opposite lip of the module frame. <br /> • Tighten the bolt to 150 in-lb to clamp the Rock-It Clip 2.0 to-the module frame and the micro-inverter/power <br /> optimizer to the Rock-'It Clip 2.0. <br /> • Ensure that.the lip on the clip is tight against the frame and that the micro-inverter/power optimizerflange is <br /> tight against the clip flange'to avoid rotation during tightening, <br /> www.ecofastensolarcom info@ecofastensoiarcom 877-859-3947 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.